Automation lowers workload when it is already low and raises it when it is already high, so coordination demand peaks when capacity is lowest.
What sets it up
- Variety deficit (the primary one). The regulator's repertoire of distinguishable responses, or its processing capacity, is smaller than the variety of disturbances it must absorb, and no attenuation or amplification has been engineered to close the gap.
- Rate, clock and sequencing mismatch. Coordinating parties run on different cycle times or clocks, or assume an ordering that nothing guarantees.
- State and mode opacity. An agent's internal state (automation mode, a partner's control inputs, commitment status, configuration, private beliefs) cannot be observed by the partner who must coordinate with it. [v2.1] This includes differential observability, where a monitor's view of a component differs from its clients' view ("gray failure"; Huang et al. 2017).
What sets it off
High-tempo phase.
What you see
Heads-down reprogramming; tasks shed.
How it plays out
- Tempo: Seconds–minutes
- Reversibility: Reversible
- Propagation: Local
Where it shows up
- Human–machine seam: flight-management reprogramming during approach
- Engineered machine systems under one design authority: operator consoles that need configuring mid-incident
- Intra-agent: agents requesting clarification at critical moments
How established it is
Est. (Wiener 1989; Woods); Prov.
Est. means established in the literature, with the field or author named; Syn., a proposed synthesis; and Prov., derived from theory, with no documented case in the set yet.