From Rensis Likert's New Patterns of Management (1961), which set out four kinds of management system from exploitive authoritative to participative group, and The Human Organization: Its Management and Value (1967), which argued for the fourth, System 4, with a profile of over forty items for placing a unit on the scale.
Places a unit's management on a scale from System 1, run by command and fear, to System 4, run by trust, group decisions, and high shared goals, and holds that units nearer System 4 perform better over time.
One depot placed on Likert's scale, practice by practice
Eight practices at the east depot, each scored from 1 (the System 1 answer) to 4 (the System 4 answer); the average places the depot on Likert's scale. It opens on the depot that tied for the lowest cost. Rescore a practice to see where the depot would stand. Illustrative.
How far managers trust drivers' judgment
East depotWhat drives effort: fear, rewards, or shared goals
East depotWhether bad news travels up or gets hidden
East depotHow much drivers can change routes and methods
East depotWhere routing and staffing decisions are made
East depotWho sets the weekly targets
East depotWhether control sits with one manager or the route teams
East depotHow much the shifts work together
East depotAverage score1.4
VerdictScore every row to see the verdict.System 1Exploitive authoritative: command and fear, decisions at the top. Output now, paid for in trust and skill.System 2Benevolent authoritative: decisions stay at the top, softened by rewards and a paternal manner.System 3Consultative: views are sought before managers decide, and routine choices move down.System 4Participative group: teams share decisions and set high goals, linked by their managers to the level above.
An example
A parcel carrier ran fourteen depots and ranked their managers on one number, cost per parcel. Two depots tied for first. The new operations vice president had both crews fill in a forty-item survey of how their depot was run: how far managers trusted drivers, where routing decisions were made, whether problems traveled up or got hidden, and who set the targets.
The answers placed the north depot near System 4. Route teams set their own weekly targets and fixed problems in a Monday huddle. The east depot sat at System 1. Its manager had cut costs with threats about overtime and a ban on questioning routes, its turnover had doubled in a year, and two of its most experienced drivers had just resigned.
Six months later the east depot's costs were the worst in the network, as new drivers learned their routes by trial and error. The carrier added the survey to every depot review and stopped paying bonuses on cost alone.
The core idea
Likert described management along one continuum with four marked points. System 1, exploitive authoritative, runs on command, threat, and decisions made at the top. System 2, benevolent authoritative, keeps decisions at the top and softens control with rewards and a paternal manner. System 3, consultative, asks for views before managers decide and lets routine choices move down. System 4, participative group, runs on supportive relationships, group decisions, and high goals set by the people who will meet them, with each manager acting as a linking pin between the team below and the team above.
The research claim is that units nearer System 4 produce more and keep their people. The sharper insight concerns time. Pressure can lift output for a few quarters while it drains loyalty, skill, and the flow of honest information. Those losses show in a survey of how people are managed well before they show in costs, so a scorecard that reads only results will reward the managers who are spending the organization down.
The thinking behind it
Rensis Likert Rensis Likert, the social psychologist who led the University of Michigan's Institute for Social Research, built his scale from studies comparing high- and low-producing units across many firms. New Patterns of Management (1961) set out the four kinds of management system and argued for participative group management. The Human Organization (1967) restated the case with more evidence, called the participative form System 4, and gave managers a profile of more than forty items on motivation, communication, decisions, goal setting, and control for placing a unit. It also proposed that firms put a dollar value on their human resources, so that spending them down would show.
Where it sits in the layers
Likert's scale sits in Layer 4, the descriptive typologies. It classifies the management system a unit actually runs, read from how people are treated, before anyone prescribes a remedy. From the layers above it takes a view of the firm in which people and their working relationships are an asset that can grow or be used up. In the layers below, it overlaps two explanatory models, Theory X and Theory Y on managers' assumptions and the Hawthorne Studies on attention and morale, and it reaches practice through employee surveys such as the Gallup Q12, which measure much of what Likert measured. The common mistake is to treat the scale as a quick reorganization. Likert warned that moving a firm toward System 4 takes years, so a survey followed by a renamed meeting changes the label and little else.
How organizations put it to work
Adopting the scale means measuring how a unit is managed as seriously as what it produces. The usual owner is the head of people, with the chief operating officer as sponsor. Three things change. A survey of management practice, close to Likert's profile, runs every six or twelve months in every unit, and its results go to the same review as the unit's costs. Bonuses weigh both, so a manager who hits the numbers by spending trust stops being paid for it. Units that score low get help in specific practices: team meetings where targets are set together, problems raised early without blame, and managers who carry their team's view to the level above.
It takes patience to sustain, because Likert stressed that changes in how people are managed reach the results only after a lag. Leaders have to hold steady through quarters when costs look no better. In the first year, expect resistance from managers whose records rest on pressure, a few departures among them, and early warnings from units whose numbers still look fine. The business that results leans less on any one manager's force of will.
Where it goes wrong
The first failure is System 4 as a mood. Managers hold more meetings and ask for views, while decisions stay where they were. The sign is a survey in which being consulted scores higher every year and influence stays flat.
The second is the single best way. The scale treats participation as right everywhere, while contingency research from the same years found that the best structure depends on the work, and routine, tightly timed operations can run well under firmer direction. The sign is a crisis or a standardized line slowed by consultation it did not need.
The third is the survey itself. Self-reports drift toward what respondents think the boss wants to read, and a loyal unit can score high without being well run. The sign is a unit whose scores rise while its turnover and error rates do not improve.
Related and rival frameworks
- Theory X and Theory Y. Explains why managers drift toward System 1 or System 4: the assumptions they hold about people. The better pick for working on managers' beliefs, where Likert measures their practice.
- Managerial Grid. Rates one manager's style on concern for people and concern for production separately. Better for coaching an individual than for placing a whole unit.
- Handy's Four Cultures. Describes the culture a unit lives in by where power sits, with no best type. Better when the question is fit with the work.
Go to the source
- New Patterns of Management, McGraw-Hill, New York, 1961
- The Human Organization: Its Management and Value, McGraw-Hill, New York, 1967