Durations, deadlines, lags and calendars, which every axis reads differently.
In full
Time appears in the explorer only as a trigger condition, which is far too small a hole for it. The recurring kinds are durations on a task, deadlines on a task or a case, minimum and maximum lags between two tasks, fixed dates, validity periods, schedule restrictions such as working hours, and cyclic elements.
A fuller catalog exists in the process time-patterns literature; this entry names the kinds rather than reproducing its numbering, because the numbering has not been checked against the source.
On each axis
- Control-Flow Topology: a deadline is a trigger and a timeout is an exit condition
- Data-Flow Topology: a datum can be stale, so freshness is a property of the route
- Resource Topology: working hours, availability and how long a performer may hold an item
- Deployment Topology: latency between nodes, which is the floor under every other timing promise
- Coordination Topology: the timeout that drives supervision, and how long a signal remains valid
While work is in flight
A deadline that fires while work is in flight is a cancellation, an escalation, or a force-completion. Which one is a recovery-policy decision, not a timing one.
Open it in the explorerWorkflow Topologies, at this entry