Developed by the International Organization for Standardization as ISO 22301, the requirements standard for business continuity management systems (first edition 2012, revised in 2019 and amended in 2024); the staged reading of continuity capability is a practitioners' convention built on it.
Judges how ready an organization is to keep working through a disruption by measuring its continuity management against ISO 22301, from a plan that exists on paper to one that has been exercised, measured, and improved.
The recovery a plan promises and the recovery that happens differ by how well the plan has been exercised
A company's plan says its main system can be recovered in 8 hours. Set what the plan promises, how far it has been exercised, and what an hour of outage costs. In this illustration an unexercised plan takes three times its promise, a tabletop-tested one 1.8 times, and a live-tested one 1.1 times; the gap between promise and outage is the measure of maturity. Illustrative.
Hours down in a real failureWhat the plan promises
An example
A regional logistics company has a continuity plan that says its warehouse management system can be recovered in eight hours. The plan was written for a customer's audit and has never been tried. When a storage failure takes the system down, recovery takes twenty-four hours, because the backups were incomplete, the person who knew the restore sequence was on leave, and the manual fallback for picking orders had never been written.
The operations director takes the gap seriously. She asks for a yearly exercise program, a tabletop walk-through of the failure with every department, then a live test of the recovery in a quiet week. The tests find the missing backup in the first month and show that the manual picking sheets work only if someone prints them in advance. Next year a network fault takes the system down again and the company is back in about nine hours. The plan is now two pages shorter and every step has a named person and a named deputy.
The core idea
ISO 22301 sets the requirements for a business continuity management system: a standing way of running the organization so that disruptions are less likely, hurt less when they come, and end sooner. It applies to organizations of any size or sector and follows the plan, do, check, act cycle shared by ISO's management system standards, with most of its continuity-specific requirements in the clause on operation.
The standard sets requirements and a basis for certification. It does not define maturity stages, and the staged reading is a practitioner's convention: first a plan that exists, then a plan that has been exercised, then recovery that is measured against its objectives and improved. The idea that makes the ladder useful is that a plan is a claim, and only an exercise tests it. The distance between the recovery time a plan promises and the one that happens in a real failure is the most honest measure of continuity maturity, and only an exercise reveals it before a real failure does.
The thinking behind it
International Organization for Standardization, standard ISO 22301 ISO 22301 is a standard of the International Organization for Standardization, written by an international committee, and has no single author. Its first edition appeared in 2012 and was replaced by the second edition in 2019. The changes in 2019 brought the text into line with ISO's updated structure for management system standards, clarified the existing requirements without adding new ones, restructured the clause on operation, and moved guidance on business impact analysis and supply chain continuity into separate technical specifications. An amendment in 2024 added text on climate change. National bodies such as BSI publish the standard in their own editions, and certification bodies assess organizations against it.
Where it sits in the layers
Business Continuity Maturity sits in Layer 7, the assessment and maturity models, because it places an organization against a stated standard and says how far it has come. It rests on the view of Resilient Organization in Layer 6, that an organization has to be built to absorb shocks as well as avoid them. It is put into practice by Crisis Management in Layer 8, which supplies the roles and decisions in the first hours, and by the Risk Register in Layer 9, where each credible disruption has an owner. The common mistake is asking a continuity score to stand in for the whole risk program. It speaks to recovering from an interruption, and leaves aside how likely the causes are and the risks that never stop operations.
How organizations put it to work
The chief operating officer or the head of risk usually owns it, with a continuity manager who runs the program and an executive sponsor who attends the reviews. It changes structure by naming a role and a deputy for each critical activity and by making each business unit responsible for its own recovery plan. It changes routines: an impact analysis of which activities matter most and how long each can be down, a yearly exercise program that rises from tabletop to live tests, and a review of every exercise and every real incident. It changes measures: the recovery time of each critical activity against its objective, and the share of plans exercised in the year.
Sustaining it takes executives who attend the exercises, a refresh of the analysis whenever the business changes, and a rule that an exercise that finds nothing is repeated with a harder scenario.
In the first year, a leader should expect a long list of single points of failure, a first exercise that goes badly, and some resistance from units that see the work as a distraction. The business gains from shorter and more predictable outages, less reliance on the knowledge of one or two people, and revenue that continues through events that would have stopped a competitor.
Where it goes wrong
The first failure is the shelf plan. The document is written for the audit and then filed. The sign is a plan that has not been exercised in a year, and staff who cannot say where it is kept.
The second is scoring the paper. Certification shows that a management system exists and was audited, and the audit can pass a plan that would fail a real test. The sign is a certificate on the wall beside a recovery time nobody has measured.
The third is a scope that follows yesterday's business. Plans cover the systems of three years ago, and the outsourced services on which the company now depends are missing. The sign is a plan with no entry for a supplier whose failure would halt output. For a small firm a full management system can be heavy, and a lean plan that is exercised regularly may serve it better.
Related and rival frameworks
- Resilient Organization. Treats resilience as a property of the whole organization. It is the better lens when the question is how a firm absorbs shocks in general more than how it recovers from one interruption.
- Crisis Management. Concerns the decisions and communication in the first hours. Pick it when the question is how leaders act, and this entry when it is how ready the organization is.
- ERM Maturity. Scores how embedded risk management is across the organization. It suits a company that wants continuity to be one part of a wider program.
Go to the source
- BS EN ISO 22301:2019+A1:2024 Security and resilience. Business continuity management systems. Requirements, BSI Knowledge, current edition published 30 September 2024, 2019
- ISO 22301:2019 versus previous versions: what's changed, TechTarget, 2019