Change Management Iceberg

Layers of Management ThoughtLayer 5: Explanatory ModelsTheoryAlso known as Krüger's iceberg, Change iceberg

Developed by Wilfried Krüger and set out in his article Implementation: the Core Task of Change Management (CEMS Business Review, 1996).

Pictures a change program as an iceberg: cost, time, and quality management show above the waterline, while the perceptions, beliefs, power, and politics that decide whether people accept the change lie below it.

A change delivers only as much as the least-accepted layer of the iceberg allows

A branch merger, rated 1 to 10 on three layers: the issue plan above the waterline (cost, time, quality), and acceptance of its meaning and of its power implications below. The program delivers up to the lowest of the three, shown as the black line. Raise the lowest layer and watch the delivery rise. Illustrative.

9
4
6
What the program can deliver, out of 10
4
Planned result left undelivered
5

Rating by layerWhat it can deliver

0510946Issue planPerceptions, beliefsPower, politics0510946Issue planPerceptions,beliefsPower, politics

An example

A bank merged the branch networks of two regional banks. The program office reported green on every measure it tracked. The integration was on budget and ahead of schedule, and the new system passed every test. Six months after the cutover, customer attrition in the former smaller network was double the plan, and a third of its experienced branch managers had left.

The program sponsor commissioned a review that looked beneath the dashboard. Staff in the smaller network believed the merger meant closing branches, and nothing in the communications had said otherwise. Two respected regional managers, who had run their areas for twenty years, saw the integration as a takeover and quietly advised their people to wait it out. The plan itself had been sound. The sponsor added a second track to the program, with listening sessions in every branch and a seat in the steering group for the regional managers, and attrition fell to plan within two quarters.

The core idea

Krüger's iceberg divides the work of change into what is visible and what is not. Above the waterline is issue management: cost, quality, and time. This is the part that plans and dashboards cover, and it is the part many managers consider to be the whole job. Below the waterline are two further tasks. The first is the management of perceptions and beliefs, the way people understand the change and what they think it means for them. The second is the management of power and politics, which includes the interests of those who gain or lose and the alliances for and against the change.

The insight is that the three levels are connected in one direction. However well the visible work is run, its results rise no higher than the acceptance beneath it allows. A program may be flawless on the visible measures and still fail because people do not believe in it or powerful people oppose it. The model asks leaders to plan for all three levels, not only the visible one.

The thinking behind it

Wilfried Krüger Wilfried Krüger, a German scholar of management and organization, is credited with the iceberg through an article titled Implementation: the Core Task of Change Management, which appeared in the CEMS Business Review in 1996. He later edited a German-language collection on strategic renewal, Excellence in Change, published by Gabler in 2000. The problem the iceberg addressed was a gap between change plans and change results. Plans were drawn up with the tools of project management, and what stopped them was seldom a technical matter. Krüger's contribution was a simple image that made the neglected part visible to executives.

Where it sits in the layers

The iceberg sits in Layer 5, the explanatory models, because it explains one phenomenon, why change programs underdeliver. It takes for granted the account in Layer 4 of culture as layered, where the visible artifacts rest on beliefs below them. It is closely related to the iceberg model of Layer 9 for seeing structure beneath events, and it is put into practice in leader rounding in Layer 10, where leaders go and listen to find what the dashboard does not show. The common mistake is asking it to be a method. It is a way of seeing which parts of a program are neglected, and it offers no steps for dealing with them.

How organizations put it to work

Executives adopt the iceberg as a framing for change programs, usually through the sponsor or the transformation office, and it is owned by whoever reports program health to the steering group. It changes decisions: a program plan must show how it will deal with perceptions and with power, as well as with cost, time, and quality. It changes structure, since the steering group includes the people whose acceptance the program depends on, and not only those who can fund it. It changes routines, with listening sessions, pulse checks, and a regular, honest read of who supports and who opposes the change. And it changes the measures: the dashboard adds indicators of acceptance beside the budget and schedule.

Sustaining it takes a sponsor who is willing to hear unwelcome news and a program office that treats the hidden work as seriously as the visible work.

In the first year a leader should expect uncomfortable findings: opposition from people thought to be allies, and beliefs about the change that nobody intended. The return is a program that delivers what it planned, with fewer losses of the people who matter most to the result.

Where it goes wrong

The first failure is to measure the surface and call it done. The dashboard still shows cost, time, and quality, and the below-the-line work is a slide. The sign is a steering group that never discusses a single named person or belief.

The second is treating the hidden levels as manipulation. Managing perceptions can turn into spin and managing power into maneuvering. People notice. The sign is communications that sound polished and have no answer to what staff actually asked.

The third is the weakness of the model as a theory. The picture is persuasive, but it is a metaphor with three labeled parts, and it offers no test of how much lies below the surface in a given program. Sources that quote proportions, such as ten percent above and ninety below, are repeating an image, and the figure does not come from the model. The sign is a presentation that treats the percentage as a finding.

Related and rival frameworks

  • Kotter's 8-Step Change Model. Offers eight steps for leading a transformation, and puts much of its weight on the hidden work of urgency and coalition. A fuller sequence, where the iceberg is a lens.
  • Schein's Three Levels of Culture. Describes the layers of culture, from visible artifacts to basic assumptions. The better pick when the barrier is culture and not one program.
  • Force Field Analysis. Lists the forces for and against a change and weighs them. A practical way to work below the waterline once the iceberg has shown it is there.

Go to the source

Back to the catalog