Created by Jake Knapp, who began running sprints at Google in 2010 and brought them to GV in 2012, where Braden Kowitz, Michael Margolis, John Zeratsky, and Daniel Burka helped refine the process; Knapp's book Sprint (2016) set it out.
Compresses the work of answering a business question into five days of mapping the problem, sketching solutions, deciding, building a realistic prototype, and testing it with customers, so a team learns before it commits to a full build.
A five-day sprint on installment payments at a bank, and the move each day that keeps the week useful
On each day, pick the move. The reply shows what follows, and the line under the panel counts the moves that keep the week answering its question. Illustrative.
Sprint team
Customers
Sprint team
Customers
Moves that keep the week answering its question: 0 of 5Moves that keep the week answering its question: 1 of 5Moves that keep the week answering its question: 2 of 5Moves that keep the week answering its question: 3 of 5Moves that keep the week answering its question: 4 of 5Moves that keep the week answering its question: 5 of 5
- The question (Customers). A nine-month build is on the table. The product head clears five days for a small team to answer one question first.
- Monday: Map (Sprint team). Pick the target for the week.
- Try to test the entire journey from first tap to final repayment. By Friday the prototype covers everything thinly, and no part of it gives a clear answer. A target too large for one week.
- Map the journey, then pick one moment to solve: the offer on the confirmation screen. The team agrees the long-term goal and aims the week at the offer. A target small enough to solve in a week.
- Tuesday: Sketch (Sprint team). Pick how the team generates solutions.
- Run an open brainstorm, and let the loudest idea set the direction. The senior voices dominate, and three of the team's best ideas are never drawn. The room's hierarchy picks the ideas.
- Review existing ideas to remix, then have everyone sketch a solution alone. Seven sketches come out, one from the customer-service lead that nobody else had thought of. Every person contributes a full idea.
- Wednesday: Decide (Sprint team). Pick how the team settles on a solution.
- Keep all seven sketches alive and prototype the best parts of each. Thursday starts with a confusing blend that no customer could follow. Nothing was decided, so the prototype is muddled.
- Critique the sketches, choose the strongest, and turn it into a storyboard. One solution is storyboarded frame by frame, ready for Thursday. A decision, written down as a plan for the prototype.
- Thursday: Prototype (Sprint team). Pick how much to build in the day.
- Start building working software for the payment flow. By evening the code runs part of the flow, and there is nothing a customer can try. A day spent on engineering, with no test ready.
- Build a realistic front-end prototype of the offer, and set the interview script. By evening the prototype looks real, and five customers are booked for the morning. Realistic enough to react to, and built in a day.
- Friday: Test (Customers). Customers use the prototype one at a time while the team watches and interviews them. Four of the five understand the offer. None trust it, because the screen never shows the total cost.
- After the test (Sprint team). Pick how the team closes the week.
- Argue about whether the customers were typical, and decide later. The findings fade by Monday, and the nine-month plan goes ahead unchanged. The learning is lost.
- Summarize what was learned and agree what the team does next. The total-cost screen is reworked first, and the build starts with that change. The week ends with a clear next step.
An example
A retail bank's mobile team had an idea for letting customers split a large purchase into installments at checkout. Estimates for building it ran to nine months, and the product head did not want to commit that much on an opinion. She cleared five days for a small team, with the head of risk and a customer-service lead in the room.
On Monday they agreed the long-term goal and mapped how a customer would get from tapping buy to repaying. They picked one moment to solve in the week: the offer on the confirmation screen. By Wednesday they had chosen one sketch and storyboarded it. On Thursday they built a realistic prototype in a day. On Friday five customers used it while the team watched.
Four of the five understood the offer. None trusted it, because the screen never showed the total cost. The team reworked that before any engineering began.
The core idea
A design sprint spends one week answering one business question before anyone builds. The week is fixed, and each day has a single job. Monday maps the problem with the people who know it and picks one target small enough to solve. On Tuesday each person sketches a full solution alone, after a look at ideas worth borrowing. Wednesday critiques the sketches, chooses one, and storyboards it. Thursday builds a prototype realistic enough to react to, with no real engineering behind it. Friday puts it in front of a handful of target customers, one at a time, while the team watches.
The logic is a trade. A believable facade shows much of what a team needs to know about an idea, how customers read it and where they balk, for a small fraction of the cost of a build. The fixed calendar forces decisions that open-ended projects defer, sketching alone keeps the loudest voice from choosing the idea, and someone in the room who can decide means the result gets used.
The thinking behind it
Jake Knapp Jake Knapp began running sprints at Google in 2010, and brought them to GV, the venture investor formerly called Google Ventures, in 2012. Braden Kowitz, Michael Margolis, John Zeratsky, and Daniel Burka then helped refine the process through many sprints with startups. In 2016 he published Sprint with John Zeratsky and Braden Kowitz, which sets the process out for any small team. The problem it answered was a familiar one: teams spent months building before they knew whether anyone wanted the result. His answer was to fix the calendar and the daily jobs, so the learning came in a week.
Where it sits in the layers
The Design Sprint sits in Layer 8, Methodologies and Operating Systems, because it is a bundled, opinionated way of running a stretch of work, with a fixed length, a day-by-day sequence, and a prescribed way of testing. From above it assumes that a product idea is a claim customers can refute, the stance of Falsificationism in Layer 0, and the Layer 6 view behind Continuous Discovery that contact with customers should steer what gets built. Its Layer 8 neighbors, Lean Startup and Design Thinking, run the same logic over longer cycles. Below it, Friday's test is a scripted round of customer interviews, a Layer 10 practice. The common mistake is to treat it as a delivery method. A sprint gives an answer about an idea, and a team that mistakes the prototype for a product ends with something to rebuild.
How organizations put it to work
A company adopts the Design Sprint as a project type. An innovation lead, a product head, or a venture unit usually owns it, picks the questions worth a sprint, and protects five days for a small team. The team needs the people who hold the pieces: someone who can decide, someone close to the customer, someone who knows the technical limits.
The structural change is the clearing of the week itself. The decision change is the most valuable one: a company that sprints a risky idea before funding it decides with evidence from real customers, and it can stop an idea cheaply. Measures can stay simple, such as the number of ideas tested and how many were stopped or reshaped before engineering started.
Sustaining it takes a leader who accepts a negative result as a success, a facilitator who keeps the days on time, and a way to carry the findings into the work that follows. In the first year a leader should expect a few sprints to change the plan, and one or two to be wasted on a question that was not ready. The return is fewer large bets placed blind, and a business that depends less on one executive's conviction.
Where it goes wrong
The first failure is the wrong question. A sprint can test whether customers want something. It cannot settle a question of technical feasibility or of long-run economics. The sign is a prototype that tests well and a build that cannot be done.
The second is the sprint as theater. A team clears a week, produces a polished prototype, and nobody with the power to decide was in the room. The sign is findings that never reach a roadmap.
The third is mistaking a small test for a verdict. Five customers show where an idea breaks and give a clue to its appeal, and they do not prove demand. The sign is a leader who treats a good Friday as a launch decision.
Another criticism is the cost: five days of several senior people is real money, so a team that sprints every idea spends the week it would have saved.
Related and rival frameworks
- Design Thinking. The broader human-centered approach with no fixed calendar. The better pick when the problem is poorly understood and needs weeks of research, where a sprint assumes the question is already framed.
- Lean Startup. Builds, measures, and learns in repeated cycles. Better when an idea needs live data over time, where a sprint gives one fast read from a prototype.
- Continuous Discovery. Keeps weekly contact with customers as a habit. Use it after a sprint to keep learning once the product is underway.
Go to the source
- Sprint: How to Solve Big Problems and Test New Ideas in Just Five Days, Simon and Schuster, New York, with John Zeratsky and Braden Kowitz, 2016
- The Design Sprint, GV, 2012