Arose at the Tavistock Institute from Eric Trist and Ken Bamforth's study of coal mining, reported in Some social and psychological consequences of the longwall method of coal-getting (1951); Fred Emery later restated the fit between the two systems as their joint optimization.
Holds that a work organization is a social system and a technical system joined together, and that designing one without the other, whether machines before people or people before machines, leaves both performing below what the whole could do.
Output of a work system when the social and technical sides are designed separately
A sorting floor produces only as much as its weaker side allows. Set how well the technical system and the social system are designed, each from 0 to 10; the plot shows which side limits output. Then see what raising each side by two points would do. Illustrative.
Where the point sitsThe technical system limits outputThe social system limits output
An example
A distribution company installed a high-speed automated sorter. The engineers laid out one-task stations along it, with each worker feeding or clearing a single point and supervisors coordinating the flow. The machine met its rated speed in testing. On the floor, output ran 30 percent below plan, absenteeism climbed, and jams waited for a supervisor to arrive. A review team asked the crews what would help. They asked to be trained on every station, to run a shift as a group, to schedule their own breaks around the flow, and to be paid on the group's output. The company retrained twelve-person crews, left the machinery alone, and let each crew regulate itself. Output reached plan within two months, jams were cleared by whoever was nearest, and absenteeism fell below the old warehouse's level.
The core idea
Sociotechnical thinking treats a work organization as two systems that depend on each other. The technical system is the machinery, layout, and process. The social system is the roles, skills, pay, and groups that run it. Each follows its own logic, and the two are coupled: neither produces the result alone. The central claim is that they have to be designed together, because optimizing one by itself leaves the whole suboptimal. The principles that followed from the original studies are concrete. The basic unit is the work system, the whole set of linked jobs, and the work group is central. Groups regulate themselves in place of outside supervision, and people develop several skills so that the group can cover for itself. People complement the machine and keep control of how it is used. The insight is that technology does not dictate its own organization, and that a choice exists.
The thinking behind it
Eric L. Trist Eric Trist reports that the sociotechnical concept arose in 1949, in the first of the Tavistock Institute's field projects in British coal mining, at a time when output had not kept pace with mechanization and men were leaving the pits. With Ken Bamforth he published the 1951 paper on the social and psychological consequences of the longwall method. In Organizational Choice (1963), written with colleagues, he described the Durham study of composite working, where groups of 40 to 50 men shared the jobs of the cycle and out-produced a comparison face by 25 percent. His 1981 occasional paper gives the history and the framework.
K. W. Bamforth Ken Bamforth had worked as a miner before he became a Tavistock fellow. After a year's training he went back to his old colliery in the South Yorkshire coalfield and returned with a report on the Haighmoor, a new seam that better roof control had opened to shortwall mining. There the men had built their own way of working, small groups that swapped roles and shifts and needed little supervision, much as miners had worked before mechanization broke the job into single tasks. Trist visited and found strong cooperation, low absenteeism, and high output, and the two published the 1951 paper together.
Fred E. Emery Fred Emery returned to the Tavistock and in a 1959 monograph proposed a first general model of the dimensions of social and technical systems. The early studies had spoken of a good fit between the two. Emery recast it, in the systems theory then available, as joint optimization: the technical system obeys physical laws and the social system human ones, yet each needs the other to turn inputs into output, so improving either alone leaves the whole worse than it could be. When Norway's industrial democracy program began in 1964, Trist records, Emery again led the way.
Where it sits in the layers
Sociotechnical systems sit in Layer 6, Improvement Philosophies, because they prescribe how work should be designed to perform better: by fitting people and technology together, where the usual practice optimizes the machines and leaves people to adapt. The idea assumes the Layer 4 view that an organization is a set of linked parts, which Leavitt's Diamond draws, and it supplies the group-level reasoning behind the individual job design in the Job Characteristics Model in Layer 5. In practice it shows up in self-managing teams and in team routines such as Scrum in Layer 8. The common mistake is to treat it as a human-relations program. Trist argued that improving relations without changing the structure of jobs had left the split at the bottom of the organization unchanged.
How organizations put it to work
A sociotechnical redesign is owned by an operations leader with a design team that includes the people who do the work. The team begins by mapping the work system: the technical steps, the variances that disturb them, and the skills and roles in place. Structure changes toward groups responsible for a whole piece of work, with multi-skilled members and a stated task. Decisions move to the group, which plans shifts and handles the problems that arise. Routines add cross-training, group meetings, and a pay or recognition scheme that rewards the group's result. Measures cover output, quality, absenteeism, and the speed at which variances are resolved. Sustaining it takes managers who change from supervisors to boundary managers, a plan for training, and patience, since the early gains can mask a rough first quarter. In the first year, expect resistance from supervisors, an uneven learning curve, and clear gains where the work has many interdependent steps.
Where it goes wrong
The first failure is to design the technology first and fit the people afterward. The sign is a new system that meets its rated speed and misses output because the crew cannot cover for each other. The second is autonomy without support: groups handed self-regulation with no training, no authority, and no change in pay find that supervisors carry on as before. The sign is a team on paper that still waits for a supervisor's approval. The third is a criticism the Tavistock researchers themselves met: the evidence was strong and was not taken up. Their Durham report was not disputed by the coal board, which had other priorities, and the union side did not reply. The sign is a successful pilot that never spreads beyond one site.
Related and rival frameworks
- Job Characteristics Model. Designs the single job for meaning and feedback. The better pick when the unit of change is the individual role.
- Toyota Production System. Optimizes the technical flow of work and relies on the team's skills to keep it running. A common partner for sociotechnical design.
- Scrum. A modern team method with a self-managing group at its center, which applies the same principle in software.
Go to the source
- Some social and psychological consequences of the longwall method of coal-getting, Human Relations 4(1), 3 to 38, 1951
- The evolution of socio-technical systems: a conceptual framework and an action research program, Ontario Quality of Working Life Centre, Occasional Paper No. 2 (Eric Trist), 1981