Developed at Toyota, chiefly by Taiichi Ohno with Eiji Toyoda's backing, from Sakichi Toyoda's self-stopping looms (jidoka) and Kiichiro Toyoda's just-in-time idea (1938); Ohno described it in Toyota Production System: Beyond Large-Scale Production (1978).
Prescribes running an operation to produce only what the next step will use, at the moment it needs it, with machines and people that stop at the first abnormality, so waste and defects are exposed and removed every day.
The two pillars on one bracket line: small lots and presses that stop themselves
A five-step line where each step takes one minute per bracket. Set how many brackets move between steps at a time, which is just-in-time, and whether presses stop at the first bad part, which is jidoka; the numbers show what each one buys. Illustrative.
An example
A maker of steel brackets for truck cabs ran its five-step line in lots of 300: each press stamped 300 parts before the cart moved on to welding, drilling, painting, and packing. A cab plant asked for daily deliveries in small lots, and the bracket maker could not quote a lead time under three days. Worse, when a die chipped, nobody noticed until welding found bad parts, by which point half a lot was scrap.
The plant manager tried the system's two pillars on one line. Machines were moved into a cell, and lots dropped to twenty and then to single brackets passed by hand between neighbors. Each press got a sensor that stopped it when a part came out of tolerance, and a light that called the team leader. The first finished bracket now left the line in minutes, scrap per chipped die fell from about 150 parts to one, and the cab plant got its daily deliveries. The stoppages also showed which dies wore fastest, and that became the next quarter's improvement work.
The core idea
The Toyota Production System aims, in Toyota's words, at "the complete elimination of waste": anything that adds cost without adding value, from overproduction and inventory to waiting, transport, unnecessary motion and processing, and defects. It rests on two pillars. Just-in-time means "making only what is needed, when it is needed, and in the amount needed," with each process pulling from the one before it, often signaled by a kanban card, and with work flowing in small lots at the pace of customer demand. Jidoka, "automation with a human touch," means machines and people stop at the first abnormality, so a defect is never passed on and the cause gets fixed where it starts. Standardized work, leveled production, and continuous improvement form the base.
The insight is that inventory and workarounds hide problems. Cutting lot sizes and stopping at every defect make problems visible and painful at once, which forces them to be solved. The system is as much a way of learning as a way of producing.
The thinking behind it
Taiichi Ohno Taiichi Ohno built the system on Toyota's shop floors, with Eiji Toyoda's firm support, and described it in Toyota Production System: Beyond Large-Scale Production (1978). Toyota could not match the volumes of the mass producers, so it had to make many kinds of vehicle efficiently in small quantities. Ohno's answer was to produce only what the next process had used, to treat every form of waste as the enemy, and to build the plant around flow. Toyota dates just-in-time's full use to 1954 and the supermarket method, in which each process draws what it needs from the one before, signaled by the kanban.
Sakichi Toyoda Sakichi Toyoda, an inventor of looms, supplied the idea behind jidoka. His power loom of 1896 carried a device that stopped it when a weft thread broke, and his Type G automatic loom of 1924 extended the principle. A machine that detects a problem and stops itself passes no defect along and frees a worker to tend several machines. Toyota traces jidoka to those looms.
Kiichiro Toyoda Kiichiro Toyoda put forward just-in-time production as Toyota's Koromo Plant started up in 1938. Eiji Toyoda recalled what he meant by it: "Just make what is needed in time, but don't make too much." Kiichiro's conviction was that "a complete car cannot be built if even one part is missing," which made the timing of every part's arrival the thing to manage. Wartime controls on materials soon suspended the effort, and the idea waited for Ohno's generation to make it work.
Where it sits in the layers
It sits in Layer 6, the improvement philosophies, because it prescribes what better means for an operation: less waste, steady flow, and quality built in at each step. From the layers above it takes the feedback logic of Cybernetics: jidoka is a control loop that halts the process the moment output departs from standard. It is put into practice by methods and routines below. The Kanban Method carries pull signals into other kinds of work, and the Gemba Walk keeps managers at the place where the work happens. The common mistake is to copy its tools, kanban cards and andon lights, without the philosophy. Tools installed in a plant whose managers still reward output volume and treat stoppages as failures produce the look of the system without its results.
How organizations put it to work
The system is owned by operations leadership, usually the head of manufacturing or the chief operating officer, with a small group of coaches, and in the end by every team leader on the floor. It changes structure by organizing production around product flow, often into cells, and by giving team leaders the job of responding when a line stops. It changes decisions by letting any operator stop the process at an abnormality, and it changes measures from how busy machines are and how much they produce toward lead time, inventory, first-pass quality, and the number of problems surfaced and solved.
A plant usually starts with one model line, where standard work, smaller lots, pull signals, and the means to stop at defects go in first. Expect output to dip as stoppages rise, because problems that inventory used to hide now stop the line. Leaders who hold steady through that dip and fund the fixes see lead times and scrap fall within months. Sustaining it takes years of daily problem solving, managers who spend time where the work happens, and a promise that improvements will not cost people their jobs.
Where it goes wrong
The first failure is copying the tools. Kanban cards, andon cords, and painted floor lanes go in, while bonuses still reward volume and stopping the line still brings blame. Spot it when the andon cord is rarely pulled.
The second is cutting inventory without cutting the causes that inventory covered. Lower stock with unreliable machines and long changeovers starves the line and turns customers away. Spot it when shortages rise as inventory falls and changeover times have not moved.
The third is using improvement to cut jobs. People stop surfacing waste once removing it threatens their colleagues. Critics also note that just-in-time supply chains with thin buffers are exposed to shocks that a buffer would have absorbed, and that the system's results depend on long-term relationships with suppliers and employees that not every company can build.
Related and rival frameworks
- Lean Thinking. The Western codification of the system as five principles for any business. The better starting point outside manufacturing.
- Just-in-Time. One pillar on its own, as a philosophy of pull and small lots. Narrower, and risky without jidoka's built-in quality.
- Kaizen. The habit of small, daily improvement that keeps the system moving. The better pick where flow is already stable and the work is refinement.
Go to the source
- Toyota Production System: Beyond Large-Scale Production, Diamond, Tokyo; English edition, Productivity Press, 1988, 1978
- Toyota Production System, Toyota Motor Corporation, company page
- 75 Years of Toyota: Just-in-Time at the Koromo Plant, Toyota Motor Corporation, company history