Developed by Philip Crosby, who worked on the Pershing missile program at the Martin Company in Orlando, Florida, in 1961 and made zero defects the center of a management philosophy in Quality Is Free (1979); James Halpin described the Martin program in a 1966 book.
Holds that quality means meeting the stated requirements every time, and that organizations should aim at zero defects by preventing errors at the source and by counting what failure costs.
What prevention spending does to the price of nonconformance
A plant makes 100,000 housings a year. Each defective housing costs a set amount in scrap, rework, freight, and claims. Move the prevention budget: in this illustration the defect rate halves for every $100K spent, the price of nonconformance falls, and the last line says whether prevention paid for itself against spending nothing. Illustrative.
An example
A maker of housings for medical devices accepted a scrap and rework rate of about six percent as the cost of doing business. The quality head started by writing down what a conforming housing was, in specifications that production, purchasing, and the customer all signed. Then she asked finance to add up what nonconformance cost in a year: scrap, rework, expedited freight, warranty claims, and the hours of the people who handled complaints.
The total was close to a million dollars. Inspection had been catching defects late, and nobody owned the question of why they occurred. She set a standard of no defects and gave each production line a short list of causes it could prevent: unclear drawings, supplier material that varied, and a changeover that skipped a check.
In a year the defect rate fell from six percent to about one and a half. Prevention had cost $200,000, the price of nonconformance had fallen by three quarters, and the plant had stopped shipping parts it knew were doubtful.
The core idea
Crosby's philosophy rests on four absolutes. First, quality is defined as conformance to requirements: the requirement comes first, and a product that meets it is of quality, however modest. Second, quality is achieved through prevention, so effort goes into stopping errors where they arise instead of finding them afterward. Third, the performance standard is zero defects, which means doing it right the first time. A standard of a small acceptable rate of failure tells people that some failure is expected. Fourth, quality is measured by the price of nonconformance: the money spent on rework, scrap, and warranty claims.
The argument is economic as much as moral. If the price of nonconformance is counted, it turns out to be large, and prevention costs less than the failures it removes. That is the meaning of the title Quality Is Free.
The insight is that a defect is a management failure that has a price, and that a standard of zero turns each error from an accepted loss into a problem someone must solve.
The thinking behind it
Philip B. Crosby Philip Crosby was a quality manager on the Pershing missile program at the Martin Company in Orlando, Florida, where in 1961 he helped lead a drive to bring the missile's defects down to half the acceptable quality level within six months. The plant beat the target, and Martin's management made zero defects the standard for all its work. Some sources credit a larger group at Martin with the program. The idea peaked in the late 1960s, and Crosby revived it in Quality Is Free (1979), which built zero defects into a 14-step improvement program and set out the absolutes of quality management.
Where it sits in the layers
Crosby's philosophy sits in Layer 6, Improvement Philosophies, because it holds a view of how quality should be improved: by prevention, with zero defects as the standard and money as the measure. From Layer 1 it takes the idea of control against a standard that Cybernetics describes: state the requirement, compare the output with it, and correct the gap. It supports the standards of Layer 7, such as ISO 9001, which also center on conformance, and in Layer 9 the tools that prevent errors at the source, such as Poka-Yoke. The common mistake is asking it to decide what a customer wants. Conformance to requirements measures how well a product meets its specification and says nothing about whether the specification is the right one.
How organizations put it to work
Crosby's philosophy is owned by the head of quality, but it works only with the backing of the chief executive and the plant or department heads who run the processes. It changes structure by placing quality as a line responsibility: each department owns the defects it produces, and quality staff support prevention and no longer inspect at the end. It changes decisions by requiring a written requirement before work begins and a standard of no defects against it.
Its routines are a cost-of-nonconformance report each month, a way for workers to name the causes of errors and for managers to act on them, and visible recognition for teams that reach their goals. Its measures are the price of nonconformance as a share of revenue, defects per unit, and the number of causes removed.
Sustaining it takes steady follow-up, since posters and slogans fade within months. In the first year a leader should expect the first accounting of nonconformance to be a shock, a visible drop in rework in the lines that take it seriously, and doubt from managers who consider zero unrealistic. The business gains products that fail less, fewer surprises in cost, and processes that run the same way after a good supervisor leaves.
Where it goes wrong
The first failure is the slogan without the system. Posters and pledges go up, and nothing is done about the causes. The sign is a campaign that lifts morale for a quarter and leaves the defect rate unchanged.
The second is a perfect product built to the wrong requirement. Conformance is a measure of consistency, and a plant can ship flawless units that customers do not want. The sign is a record of zero returns alongside falling sales.
The third is treating zero as a command instead of a direction. Where managers punish any defect, people hide errors, and the price of nonconformance is understated. The sign is a reported defect rate that falls while customer complaints rise. Critics also note that the last few defects can cost more to remove than they are worth, which an honest price of nonconformance will show.
Related and rival frameworks
- Total Quality Management. Spreads quality across every function and every employee. The better pick when the aim is a company-wide system more than one standard for defects.
- Deming's 14 Points and System of Profound Knowledge. Roots quality in variation and the system, and warns against numerical targets. The better pick when slogans and quotas are part of the problem.
- Juran Trilogy. Frames quality as planning, control, and improvement, with fitness for use as the test. The better pick when customers' needs, more than a written specification, define quality.
Go to the source
- Quality Is Free: The Art of Making Quality Certain, Philip B. Crosby, first edition; a Signet edition followed in 1980, 1979
- Zero Defects: A New Dimension in Quality Assurance, James F. Halpin, 1966
- Zero Defects, iSixSigma dictionary entry, by Ken Feldman, 2018