Lean Thinking

Layers of Management ThoughtLayer 6: Improvement PhilosophiesPhilosophyAlso known as Lean Manufacturing, Lean Production, Lean

Named lean production by John F. Krafcik (1988) in MIT's International Motor Vehicle Program, popularized by James P. Womack, Daniel T. Jones, and Daniel Roos in The Machine That Changed the World (1990), and generalized into five principles in Womack and Jones's Lean Thinking (1996).

Treats any business as a set of value streams to improve by specifying value as the customer sees it, making the value-creating steps flow at the pace of customer pull, and removing everything else.

Eight steps in one window order, sorted by what each does for the customer

Select a step from the order's value stream, then the column it belongs in: the column lights and says what to do with that kind of step. Show the sort to compare yours. Illustrative.

Items (select one, then a box)
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste
  • Not placedPlacedValue-creatingType one wasteType two waste

Steps

Order
Value-creating
Type one waste
Type two waste
Creates valueWaste, needed todayWaste, avoidable now

What the step does for the homeowner

Measure the opening.Not placed yet.Measure the opening.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.Measuring is part of making a window that fits this house: the homeowner would pay for it.Measure the opening.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Measure the opening.Type two waste: Creates no value and can go now. Remove it in this round.Cut and glaze the frame.Not placed yet.Cut and glaze the frame.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.This is the product taking shape.Cut and glaze the frame.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Cut and glaze the frame.Type two waste: Creates no value and can go now. Remove it in this round.Install at the house.Not placed yet.Install at the house.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.The fitted window is what the homeowner bought.Install at the house.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Install at the house.Type two waste: Creates no value and can go now. Remove it in this round.Retype the order.Not placed yet.Retype the order.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.Retype the order.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Retype the order.Type two waste: Creates no value and can go now. Remove it in this round.Copying data between two systems adds nothing and invites errors. One shared order form removes it now.Nine days in the queue.Not placed yet.Nine days in the queue.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.Nine days in the queue.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Nine days in the queue.Type two waste: Creates no value and can go now. Remove it in this round.Waiting is the largest waste in the stream, and scheduling from the installers' calendar removes most of it.Trip to the warehouse.Not placed yet.Trip to the warehouse.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.Trip to the warehouse.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Trip to the warehouse.Type two waste: Creates no value and can go now. Remove it in this round.Moving frames away and back adds days and damage. Putting cutting beside glazing ends it.Inspect incoming glass.Not placed yet.Inspect incoming glass.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.Inspect incoming glass.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.No value to the homeowner, but needed while the supplier's quality is unreliable. It goes when the supplier improves.Inspect incoming glass.Type two waste: Creates no value and can go now. Remove it in this round.Rework misfit windows.Not placed yet.Rework misfit windows.Value-creating: Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.Rework misfit windows.Type one waste: Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.Pure cost, but unavoidable until the measuring method is fixed. The template change is what will remove it.Rework misfit windows.Type two waste: Creates no value and can go now. Remove it in this round.

Your sort matched 0 of 8.Your sort matched 1 of 8.Your sort matched 2 of 8.Your sort matched 3 of 8.Your sort matched 4 of 8.Your sort matched 5 of 8.Your sort matched 6 of 8.Your sort matched 7 of 8.Your sort matched 8 of 8.

Value-creating
Steps the homeowner would pay for if they saw them: they turn the order into a fitted window. Keep them and make them flow.
Type one waste
Creates no value, but cannot go yet with today's suppliers, equipment, or rules. Plan its removal as capability improves.
Type two waste
Creates no value and can go now. Remove it in this round.

The sort

  • Measure the opening: Value-creating. Measuring is part of making a window that fits this house: the homeowner would pay for it.
  • Cut and glaze the frame: Value-creating. This is the product taking shape.
  • Install at the house: Value-creating. The fitted window is what the homeowner bought.
  • Retype the order: Type two waste. Copying data between two systems adds nothing and invites errors. One shared order form removes it now.
  • Nine days in the queue: Type two waste. Waiting is the largest waste in the stream, and scheduling from the installers' calendar removes most of it.
  • Trip to the warehouse: Type two waste. Moving frames away and back adds days and damage. Putting cutting beside glazing ends it.
  • Inspect incoming glass: Type one waste. No value to the homeowner, but needed while the supplier's quality is unreliable. It goes when the supplier improves.
  • Rework misfit windows: Type one waste. Pure cost, but unavoidable until the measuring method is fixed. The template change is what will remove it.

An example

A maker of replacement windows took 41 days from a homeowner's signed order to installation, though the work itself, measuring, cutting, assembling, and installing, took under four hours. The operations director walked one order through the business with her team and drew every step it passed. The order was typed into the sales system and then retyped into the plant's. It waited nine days for a production slot. Frames were cut in one building, moved to a warehouse, and moved back for glazing. Glass from a struggling supplier was inspected on arrival, and windows that did not fit came back for rework.

The team sorted the steps. Re-keying, the warehouse trip, and the queue could go at once. Inspection and rework had to stay until the supplier and the measuring improved. They put cutting and glazing side by side, scheduled production from the installers' calendar, and fixed the measuring template that caused most misfits. Lead time fell to twelve days, and the review of the next misfit became a monthly routine.

The core idea

Lean thinking starts from the customer. Value is what a customer would pay for, specified for a product family, and anything that uses up resources while creating none of that value is waste, which Toyota calls muda. Five principles follow. Specify value from the customer's standpoint. Identify the value stream, every step from order to delivery, and sort the steps into those that create value, those that create none but cannot yet be avoided, and those that can go now. Make the value-creating steps flow without stops, batches, or detours. Let the customer pull, so nothing is made before it is needed. Then pursue perfection by repeating the cycle, since each round exposes more waste.

The insight is how much of any process is waste. In most value streams the time spent creating value is a small fraction of the elapsed time, and the rest is waiting, moving, checking, and correcting. Improving the value-creating steps barely moves lead time. Removing the waste between them moves it a great deal.

The thinking behind it

James P. Womack James P. Womack worked in MIT's International Motor Vehicle Program, whose comparison of car makers he reported with Daniel T. Jones and Daniel Roos in The Machine That Changed the World (1990). The book argued that the Japanese system, which the program called lean production, used far fewer resources of every kind than mass production: less effort, space, inventory, and time. With Jones he then asked how the same thinking would work in any business, and their answer was Lean Thinking: Banish Waste and Create Wealth in Your Corporation (1996).

Daniel T. Jones Daniel T. Jones worked with Womack in the motor vehicle program and co-wrote both books. Lean Thinking carried the ideas beyond car plants and set out the five principles: specify value, identify the value stream, make the value-creating steps flow, let the customer pull, and pursue perfection. Its sorting of activity into value-creating steps, waste that cannot yet be avoided, and waste that can be removed at once gave managers outside manufacturing a way to see their own processes.

John F. Krafcik John F. Krafcik, an engineer who had worked at NUMMI, the General Motors and Toyota joint venture, before joining the motor vehicle program, coined the term in Triumph of the Lean Production System (1988), in Sloan Management Review. He set lean production, with inventory kept to a minimum so that problems are detected and solved quickly, against the buffered system of large inventories and repair areas that hid them.

Where it sits in the layers

It sits in Layer 6, the improvement philosophies, because it prescribes what better means for any process: more value for the customer with less waste, ever closer to perfection. From the layers above it takes the claim of General Systems Theory that a whole behaves differently from its parts, which is why lean maps the entire value stream before improving any step. It is put into practice by tools and routines below: Value Stream Mapping draws the stream and its waste, and the A3 Coaching Session teaches people to solve one problem at a time. The common mistake is to treat lean as a cost-cutting program. Its measure is value and flow for the customer, and a head-count target dressed as lean turns waste removal into a threat.

How organizations put it to work

Lean usually enters through operations, owned by the chief operating officer with a small team of coaches, and spreads to other functions once a model line or value stream shows results. The first year's work is concrete: pick one value stream, map it from order to delivery with the people who do the work, sort the steps, and remove the waste that can go now. Then make the remaining steps flow, often by moving equipment or people next to each other, and link production to customer demand so nothing is made ahead of need.

It changes structure by organizing work around value streams, each with a manager accountable for it from order to delivery. It changes measures from departmental efficiency toward lead time, first-pass quality, and inventory. It changes routines: daily problem solving at the work, standard work, and regular reviews of the map. Expect lead time and inventory to fall within months on the model stream and much slower progress elsewhere, since every new stream starts with its own resistance. Sustaining it takes leaders who coach at the work, and a commitment that people freed by improvement move to growth, so they keep surfacing waste.

Where it goes wrong

The first failure is lean as a toolkit. Workshops install visual boards, floor markings, and kanban, and the value stream is never mapped. Spot it when nobody can say what the customer values in the process being improved.

The second is lean as head-count reduction. The first round of savings becomes layoffs, and the people who know where the waste is stop pointing to it. Spot it when improvement ideas dry up after the first cuts.

The third is removing buffers before removing the causes they cover. Inventory comes out while machines, suppliers, and demand stay unreliable, and service collapses. Spot it when shortages and expediting rise as stock falls. Critics add that lean can intensify work and strip out the slack people need, and that lean supply chains proved fragile when large shocks hit.

Related and rival frameworks

  • Toyota Production System. The system lean was drawn from, with its two pillars of just-in-time and jidoka. The better guide inside a factory.
  • Lean Six Sigma. Pairs lean's waste removal with Six Sigma's statistical control of variation. Better when defects, more than delays, are the main problem.
  • Theory of Constraints. Focuses improvement on the one step that limits output. Faster when a single bottleneck dominates the whole value stream.

Go to the source

  • Triumph of the Lean Production System, Sloan Management Review, Fall, 1988
  • The Machine That Changed the World, Rawson Associates, New York, 1990
  • Lean Thinking: Banish Waste and Create Wealth in Your Corporation, 1996

Back to the catalog