Developed at Motorola from Bill Smith's work linking field failures to defects (adopted around 1986) and turned into a method by Mikel J. Harry (The Nature of Six Sigma Quality, 1988); General Electric spread it across industries from late 1995.
Defines quality as freedom from variation that customers can feel, and improves processes through statistical projects until defects fall to a few per million opportunities.
Two thousand prescription orders against a 24-hour promise
Each bar counts orders by hours from approval to shipment; the dashed line is the promise. Move the average and the spread and compare what each does to the share of late orders. Illustrative.
- Hours to ship: on average 16 hours, with a standard deviation of 5.
Hours from approval to shipment
Runs so far: 2,000 of 2,000
- Average
- 16.1 hours
- Shipped late, after 24 hours
- 4.9%
- Ninety-nine in a hundred ship within
- 28 hours
An example
A mail-order pharmacy promised that approved prescriptions would ship within 24 hours. Its average was 16 hours, well inside the promise, yet about one order in twenty shipped late, and late orders drove most complaints and a growing share of cancelled accounts. Management's first plan was to add staff and bring the average down.
A Six Sigma team measured every order for a month and found the problem was the spread. Orders approved late in the afternoon waited for the next morning's pharmacist check, and verification ran in batches of fifty. The team added an evening check shift and moved verification to a steady flow. The average barely moved, from 16 hours to 15, but the spread narrowed from about five hours to two, and late orders fell from one in twenty to a few per million. The control chart the team left behind now flags drift before customers feel it, and the staff the first plan would have hired were never needed.
The core idea
Six Sigma treats quality as a problem of variation. Every process output varies, and a defect is any result outside what the customer will accept, the specification limit. Sigma, the standard deviation, measures the spread, and a process's sigma level is how many of those spreads fit between its average and the nearest limit. At six, defects all but disappear; the method's target, 3.4 defects per million opportunities, allows for the drift real processes show over time.
The work is done in projects, each following a fixed cycle: define the problem and what the customer requires, measure the process, analyze which inputs drive the variation, improve them, and control the result so it holds. Trained specialists, ranked in belts, lead the projects with statistical tools. The insight is that customers feel the spread. A process can meet its promise on average and still fail one customer in twenty, and narrowing the variation often helps more than improving the average, and costs less.
The thinking behind it
Bill Smith Bill Smith, a quality engineer at Motorola, studied why products failed early in customers' hands. In 1985 he linked those failures to defects found and repaired during manufacturing: a product that needed repair in the plant was the one likely to fail in the field. The lesson was that the process had to stop making defects in the first place, and he proposed a standard demanding enough to make that happen. Motorola adopted his Six Sigma principles around 1986, and in 1988 won the Malcolm Baldrige National Quality Award in its first year.
Mikel J. Harry Mikel J. Harry, then a senior staff engineer in Motorola's Government Electronics Group, drafted the company's roadmap for spreading the approach, which Motorola called the Yellow Brick Road to Six Sigma, and put teams to work using statistics on design and production problems. His The Nature of Six Sigma Quality (1988), from Motorola University Press, set out the statistical reasoning behind the standard.
Where it sits in the layers
It sits in Layer 6, the improvement philosophies, because it prescribes what better means for a process: less variation, measured against what the customer requires. From the layers above it takes the confidence of Positivism that a process can be known through measurement and improved by testing claims against data. It is put into practice by methods and tools below: DMAIC is its project cycle, and Statistical Process Control holds the gains once a project closes. The common mistake is to treat it as a strategy. It improves processes that already exist against requirements already known, and it says nothing about which processes, products, or markets deserve the effort.
How organizations put it to work
Six Sigma is usually sponsored by the chief executive and run by a deployment leader with a small staff, because its results depend on choosing projects that matter. The structure is a hierarchy of trained people: executive champions who pick and sponsor projects, full-time Black Belts who lead them, and part-time Green Belts who run smaller projects in their own areas. General Electric, which took it up company-wide from late 1995, reported three years later that thousands of full-time Black Belts were driving its projects and that virtually every professional was trained as a Green Belt.
It changes decisions by requiring data before a fix: a project defines the customer's requirement, measures the current process, and proves which inputs drive the defects before changing them. Measures shift toward defects per million opportunities, process capability, and cost of poor quality, tracked project by project. In the first year a company typically trains its first wave, completes a few dozen projects of three to six months each, and books savings that pay for the training. Sustaining it means choosing projects from the strategy, keeping the controls in place after the team leaves, and promoting the people who lead the work.
Where it goes wrong
The first failure is the belt factory. Training and certification become the goal, projects are chosen to finish quickly, and savings are claimed generously. Spot it when certifications rise and the customer measures do not move.
The second is applying it where variation is not the problem. Statistical projects on a process with a broken design, a missing step, or the wrong customer requirement polish what should be redesigned. Spot it when projects keep improving a process customers are abandoning.
The third is losing the gains. The team moves on, the controls lapse, and the process drifts back. Spot it when the same defect returns a year later as a new project. Critics also argue that its emphasis on measurable, existing processes can crowd out innovation, and that its target of 3.4 defects per million, with its allowance for drift, is a convention more than a law.
Related and rival frameworks
- Lean Six Sigma. Combines Six Sigma's control of variation with lean's removal of waste and delay. The better pick when slow flow and defects come together.
- Total Quality Management. The broader quality philosophy Six Sigma grew within, aimed at everyone's daily work more than at expert-led projects.
- DMADV. Six Sigma's cycle for designing a new process or product to the standard from the start. Use it when there is no process worth fixing.
Go to the source
- Six Sigma quality program at Motorola, Motorola, 1986
- The Nature of Six Sigma Quality, Motorola University Press, 1988