DMADV

Layers of Management ThoughtLayer 9: Tools and TechniquesMethodologyAlso known as DMADV / DFSS, Design for Six Sigma, Define, measure, analyze, design, verify

Developed within the Six Sigma tradition in the 1990s with no single author; an early dated account is B. Smith's 1993 article Six-sigma design from Motorola, and Jiju Antony wrote about it for managers in 2002.

A five-phase method for designing a new product or process so that it meets measured customer requirements from the start, used where there is no existing process for the improvement cycle of Six Sigma to work on.

Seven problems at a bank: improve the process, or design a new one?

Select a problem, then the method that fits it. If a process exists and tuning can bring it to target, the improvement cycle applies; if there is nothing yet, or tuning has run out, the design method does. Show the sort to compare yours. Illustrative.

Items (select one, then a box)
  • Not placedPlacedImprove it: DMAICDesign it: DMADV
  • Not placedPlacedImprove it: DMAICDesign it: DMADV
  • Not placedPlacedImprove it: DMAICDesign it: DMADV
  • Not placedPlacedImprove it: DMAICDesign it: DMADV
  • Not placedPlacedImprove it: DMAICDesign it: DMADV
  • Not placedPlacedImprove it: DMAICDesign it: DMADV
  • Not placedPlacedImprove it: DMAICDesign it: DMADV

Problems

At the bank
Improve it: DMAIC
Design it: DMADV
A process tuning can fixNothing yet, or tuning failed

What the team has to work with

Loan approvals take 11 days. The process runs daily, with timestamps at each step.Not placed yet.Loan approvals take 11 days. The process runs daily, with timestamps at each step.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.A running process with data. Measure it, find the delay, fix it, and keep it in control.Loan approvals take 11 days. The process runs daily, with timestamps at each step.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.Call handling time rising. Monthly averages are available for three years.Not placed yet.Call handling time rising. Monthly averages are available for three years.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.Years of data on an existing process, so the improvement cycle can find the cause.Call handling time rising. Monthly averages are available for three years.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.Payment-run errors. A nightly run with a known error rate.Not placed yet.Payment-run errors. A nightly run with a known error rate.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.A defined process with a measurable defect rate. Improve it in place.Payment-run errors. A nightly run with a known error rate.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.Credit line for contractors. A product the bank has never offered.Not placed yet.Credit line for contractors. A product the bank has never offered.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.Credit line for contractors. A product the bank has never offered.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.No process and no data yet. Measure what contractors need, then design to it.A new mobile sign-up service. Nothing exists today.Not placed yet.A new mobile sign-up service. Nothing exists today.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.A new mobile sign-up service. Nothing exists today.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.A blank page, so requirements come first and the design is verified in a pilot.Readable statements. The current format cannot be fixed by adjusting it. The whole layout is to be replaced.Not placed yet.Readable statements. The current format cannot be fixed by adjusting it. The whole layout is to be replaced.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.Readable statements. The current format cannot be fixed by adjusting it. The whole layout is to be replaced.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.A replacement design with requirements to measure, so this is design work.Stuck after four fixes. Four rounds of tuning left it far from target.Not placed yet.Stuck after four fixes. Four rounds of tuning left it far from target.Improve it: DMAIC: Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.Stuck after four fixes. Four rounds of tuning left it far from target.Design it: DMADV: Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.When tuning cannot reach the target, the process itself needs a new design.

Your sort matched 0 of 7.Your sort matched 1 of 7.Your sort matched 2 of 7.Your sort matched 3 of 7.Your sort matched 4 of 7.Your sort matched 5 of 7.Your sort matched 6 of 7.Your sort matched 7 of 7.

Improve it: DMAIC
Define, measure, analyze, improve, control. Use it when the process runs today and its data can show where it goes wrong.
Design it: DMADV
Define, measure requirements, analyze options, design, verify. Use it when the thing is new, or when the old one cannot reach its target however it is tuned.

The sort

  • Loan approvals take 11 days: Improve it: DMAIC. A running process with data. Measure it, find the delay, fix it, and keep it in control.
  • Call handling time rising: Improve it: DMAIC. Years of data on an existing process, so the improvement cycle can find the cause.
  • Payment-run errors: Improve it: DMAIC. A defined process with a measurable defect rate. Improve it in place.
  • Credit line for contractors: Design it: DMADV. No process and no data yet. Measure what contractors need, then design to it.
  • A new mobile sign-up service: Design it: DMADV. A blank page, so requirements come first and the design is verified in a pilot.
  • Readable statements: Design it: DMADV. A replacement design with requirements to measure, so this is design work.
  • Stuck after four fixes: Design it: DMADV. When tuning cannot reach the target, the process itself needs a new design.

An example

A bank's small-business team had used Six Sigma's improvement cycle to shorten approvals on its existing loans, and it worked: a fixed, measured process with variation to remove. Then the bank decided to launch a line of credit for self-employed contractors, which had no process, no data, and no history. The team switched to a design method. It defined the goal as a decision on the same day and a loss rate inside a set limit, then interviewed contractors to measure what they needed and what proof of income they could actually produce.

The analysis compared three designs, and the winner used bank-statement data in place of tax returns. The team built it in detail, with a failure review of each step, and verified it with a pilot of 200 applicants. Same-day decisions held, and losses came in under the limit. The launch needed one rework in the first year, which the team traced to a requirement the interviews had missed.

The core idea

DMADV stands for define, measure, analyze, design, and verify. It is the design counterpart of the improvement cycle in Six Sigma and is also called Design for Six Sigma. In the first phase the team defines the goals for the new product or process, tied to what the customer and the business want. In the second it measures requirements, turning customer needs into numbers with targets. In the third it analyzes design options against those requirements and picks one. In the fourth it designs the chosen option in detail and plans how to test it. In the fifth it verifies the design in a pilot, then hands it to the people who will run it.

The idea behind it is that defects are cheapest to remove before they exist. The aim is a new product or process that performs at Six Sigma levels from launch, without years of repair. The improvement cycle has a process to measure and fix, and DMADV serves the case where none exists yet.

The thinking behind it

Six Sigma practitioners in the 1990s, building on design work at Motorola No single person devised DMADV; it grew within the Six Sigma tradition during the 1990s. An early dated source is B. Smith's 1993 IEEE Spectrum article, Six-sigma design, written from Motorola. Jiju Antony's 2002 article in Work Study gives the reason for the turn to design: as firms push their processes toward six sigma, they often find they must redesign the products and services themselves to keep defects out from the start. Torben Hasenkamp's 2010 review still treats Design for Six Sigma as young and maps its tools onto the stages of engineering design. Phase names vary by firm and author.

Where it sits in the layers

DMADV sits in Layer 9, Tools and Techniques, as a portable five-phase roadmap for design work. It carries the philosophy of Six Sigma in Layer 6, which treats variation as the enemy of quality, from improving processes into designing them, and it follows Total Quality Management, also in Layer 6, in building quality into the work from the start. Inside its own layer it calls on Quality Function Deployment to turn customer needs into requirements, and below, its phase reviews become the gate meetings of Layer 10. The common mistake is applying it to a process that already exists. That job belongs to DMAIC, and a design method on a fixable process spends months on work an improvement cycle would finish in weeks.

How organizations put it to work

Ownership usually sits with the quality or innovation function, with a trained specialist guiding a cross-functional design team and a sponsor from the business. A project begins with a charter that states the customer requirements and the measurable targets, and it moves through reviews at the end of each phase, where the team shows evidence before it goes on.

The structure it adds to product development is a set of gates tied to data. Customer research precedes design. Requirements carry numbers and tolerances. Options are compared against them, and a pilot under realistic conditions decides whether the design is ready. Tools such as customer interviews, requirement matrices, failure reviews, and simulation support each phase. The measures are requirements met in the pilot, defects per million at launch, time to market, and cost of rework after launch.

Sustaining it takes trained specialists, executives who accept a longer front end, and a habit of recording requirements in measurable form. In the first year a leader should expect resistance to measuring things the team thinks are obvious, a slower start than the usual development process, and the first visible gain in avoided redesign after launch.

Where it goes wrong

The first failure is the wrong tool for the job. A team that uses a design method on a process that can be improved spends months on work an improvement cycle would finish faster. The sign is a project that restarts an existing process from a blank page.

The second is wrong requirements. If customer needs are measured badly, the design reaches six sigma performance against the wrong target. The sign is a product that meets every specification and still fails to win users.

The third is a pilot that does not resemble real use. A verification run with hand-picked customers hides the problems of the full launch. The sign is a launch that needs heavy rework in the first year.

The fourth is rigid process. The method fits products with clear, measurable requirements better than exploratory ones, where heavy measurement can crowd out creative options. The sign is a team measuring requirements that its users cannot yet state.

Related and rival frameworks

  • DMAIC. The improvement cycle for processes that already exist. The better pick whenever there is a current process with data to measure and fix.
  • Quality Function Deployment. Translates customer wants into design requirements in a structured matrix. Better as a tool inside the measure phase than as a replacement for the method.
  • Failure Mode and Effects Analysis. Lists the ways a design could fail and ranks them by risk. Better for the design and verify phases, where the team needs to find weak points before launch.

Go to the source

Back to the catalog