5S

Layers of Management ThoughtLayer 9: Tools and TechniquesToolAlso known as Five S, Sort, set in order, shine, standardize, sustain, Seiri, seiton, seiso, seiketsu, shitsuke

From Japanese manufacturing practice set down by Takashi Osada, whose Japanese book of 1989 became The 5S's: Five Keys to a Total Quality Environment in English in 1991, and by Hiroyuki Hirano, whose 5 Pillars of the Visual Workplace appeared in English in 1995.

Organizes a workplace in five steps, sort, set in order, shine, standardize, and sustain, so that whatever the work needs is in its place, problems are easy to see, and the order holds without constant supervision.

Sorting and placing eight items in a machining cell

Red-tag day in one cell: for each item, ask whether the cell's work needs it and how often it is used. Select an item, then the box where it belongs; the box says where it goes. Show the sort to compare yours. Illustrative.

Items (select one, then a box)
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove
  • Not placedPlacedAt the machineOn a marked shelfIn the labeled storeRed tag: remove

Does this cell's work need it?

YesNo
At the machine
On a marked shelf
In the labeled store
Red tag: remove
Every shiftWeeklyRarely

How often the cell's work uses it

Calipers. The operators measure a part every few minutes.Not placed yet.Calipers. The operators measure a part every few minutes.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Used every shift, so it lives at the machine in an outlined place.Calipers. The operators measure a part every few minutes.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Calipers. The operators measure a part every few minutes.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Calipers. The operators measure a part every few minutes.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Torque wrench. Used on every fitting, at the machine.Not placed yet.Torque wrench. Used on every fitting, at the machine.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Used every shift, so it belongs within reach, with an outline that shows when it is missing.Torque wrench. Used on every fitting, at the machine.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Torque wrench. Used on every fitting, at the machine.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Torque wrench. Used on every fitting, at the machine.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Coolant test strips. Checked once a week.Not placed yet.Coolant test strips. Checked once a week.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Coolant test strips. Checked once a week.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.A weekly need earns a marked shelf nearby, not a place at the machine.Coolant test strips. Checked once a week.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Coolant test strips. Checked once a week.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Gauge block set. Used for the weekly calibration check.Not placed yet.Gauge block set. Used for the weekly calibration check.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Gauge block set. Used for the weekly calibration check.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Weekly use, so it sits on a labeled shelf close to the cell.Gauge block set. Used for the weekly calibration check.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Gauge block set. Used for the weekly calibration check.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Spare spindle belt. Replaced a couple of times a year.Not placed yet.Spare spindle belt. Replaced a couple of times a year.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Spare spindle belt. Replaced a couple of times a year.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Spare spindle belt. Replaced a couple of times a year.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Needed, but rarely. A labeled place in the central store keeps it findable without crowding the cell.Spare spindle belt. Replaced a couple of times a year.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Retired part fixture. Made for a product discontinued three years ago.Not placed yet.Retired part fixture. Made for a product discontinued three years ago.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Retired part fixture. Made for a product discontinued three years ago.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Retired part fixture. Made for a product discontinued three years ago.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Retired part fixture. Made for a product discontinued three years ago.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.The cell no longer makes the part, so it is tagged and removed.Box of broken drill bits. Kept in case they could be resharpened.Not placed yet.Box of broken drill bits. Kept in case they could be resharpened.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Box of broken drill bits. Kept in case they could be resharpened.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Box of broken drill bits. Kept in case they could be resharpened.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Box of broken drill bits. Kept in case they could be resharpened.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Nobody resharpens them in this cell. Tagged and removed, which also frees a shelf.Radio and old mugs. Collected on the bench over the years.Not placed yet.Radio and old mugs. Collected on the bench over the years.At the machine: Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.Radio and old mugs. Collected on the bench over the years.On a marked shelf: Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.Radio and old mugs. Collected on the bench over the years.In the labeled store: Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.Radio and old mugs. Collected on the bench over the years.Red tag: remove: Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.Not part of the work, and they hide the surface. Tagged and removed.

Your sort matched 0 of 8.Your sort matched 1 of 8.Your sort matched 2 of 8.Your sort matched 3 of 8.Your sort matched 4 of 8.Your sort matched 5 of 8.Your sort matched 6 of 8.Your sort matched 7 of 8.Your sort matched 8 of 8.

At the machine
Needed every shift: give it a marked place within arm's reach of where it is used, with an outline so a gap is visible.
On a marked shelf
Needed weekly: keep it near the cell on a labeled shelf, so fetching it takes seconds and returning it is obvious.
In the labeled store
Needed now and then: keep it in a central, labeled place and log its location so nobody hunts for it.
Red tag: remove
Not needed by this cell's work: tag it, move it to a holding area, and decide in two weeks whether it is reused, sold, or scrapped.

The sort

  • Calipers: At the machine. Used every shift, so it lives at the machine in an outlined place.
  • Torque wrench: At the machine. Used every shift, so it belongs within reach, with an outline that shows when it is missing.
  • Coolant test strips: On a marked shelf. A weekly need earns a marked shelf nearby, not a place at the machine.
  • Gauge block set: On a marked shelf. Weekly use, so it sits on a labeled shelf close to the cell.
  • Spare spindle belt: In the labeled store. Needed, but rarely. A labeled place in the central store keeps it findable without crowding the cell.
  • Retired part fixture: Red tag: remove. The cell no longer makes the part, so it is tagged and removed.
  • Box of broken drill bits: Red tag: remove. Nobody resharpens them in this cell. Tagged and removed, which also frees a shelf.
  • Radio and old mugs: Red tag: remove. Not part of the work, and they hide the surface. Tagged and removed.

An example

A machining cell that made hydraulic fittings lost about a seventh of every shift to hunting for gauges, fixtures, and spare tools. Changeovers ran long because nobody trusted the cart to hold the right fixture. The plant manager asked the cell's supervisor and six operators to give one day to 5S. They tagged every item in the cell, about four hundred, and asked of each whether the cell's work needed it and how often.

A third had no use there and went to a holding area. Calipers and torque wrenches received shadowed outlines at the machines, weekly items moved to marked shelves, and rarely used fixtures went to a labeled rack at the end of the cell. Wiping down the machines exposed two coolant leaks that grime had hidden for months. Search time fell to a few minutes a shift, and a ten-minute check at the start of each shift held the gain.

The core idea

5S is five steps applied to a workplace in order. Sort, or seiri, separates what the work needs from what it does not and removes the rest. Set in order, seiton, gives every needed item one defined place, nearest the point of use for the things used most. Shine, seiso, cleans the workplace in a way that doubles as inspection, since leaks, wear, and damage show on a clean surface. Standardize, seiketsu, turns the first three into a shared and visible standard of labels, outlines, and checklists. Sustain, shitsuke, builds the habit and the audits that keep it.

The idea that makes it more than housekeeping is that order makes the workplace report on itself. When every item has a place, a missing tool, a spill, or a stray part is visible at a glance, to anyone. A 2008 study of Japanese firms describes 5S as an integrated management system with a visible, technical side and an invisible, philosophical one, and finds both at work in each of the five steps.

The thinking behind it

Takashi Osada Takashi Osada wrote about 5S first in Japanese, in a 1989 book whose title translates as 5S: Handmade Management Method, published in Tokyo by JIPM. The English edition, The 5S's: Five Keys to a Total Quality Environment, came from the Asian Productivity Organization in 1991, and a history of the practice on leanproduction.com counts it the first English-language book to name 5S. Its title ties the five S words to the aim of a workplace where quality is everyone's business.

Hiroyuki Hirano Hiroyuki Hirano, a specialist in just-in-time production, laid out 5S as five pillars in 5 Pillars of the Visual Workplace: The Sourcebook for 5S Implementation, published by Productivity Press in 1995. The book treats sort, set in order, shine, standardize, and sustain as the base for efficient work, reliable equipment, and steady improvement. Its bluntest point concerns sequence: a company that cannot keep these five disciplines should not expect to carry off a bigger change such as just-in-time or a reengineering program.

Where it sits in the layers

5S sits in Layer 9, Tools and Techniques, as a portable practice for one workspace at a time. It takes for granted the view in Lean Thinking, Layer 6, that waste hides in disorder and that people near the work should see it. It supports Kaizen, because small improvements need a stable baseline, and it shows up each week in Layer 10 when leaders do a Gemba Walk and read the floor. The common mistake is asking 5S to improve the process. It makes the workplace orderly and visible, and it does not change the sequence of work, the layout of the flow, or the cause of a defect.

How organizations put it to work

5S belongs to the area manager, with a plant leader as sponsor and a coordinator who trains teams and keeps the audit calendar. Adoption goes area by area, starting with a pilot cell whose results the rest can see.

Each area runs a red-tag day: every item is tagged, items without a use go to a holding area for a set period, and the rest receive places by frequency of use. Shadow boards, floor markings, and labels follow, along with a cleaning schedule that names who inspects what. A short check at the start of each shift, and a weekly audit by people from another area, keep the standard alive. The measures are search time, changeover time, safety incidents, floor space released, and audit scores.

Sustaining it takes protected time in the shift, leaders who walk the areas and ask about the standard, and root-cause fixes for mess that keeps returning, such as bulky supplier packaging. In the first year a leader should expect quick gains in the pilot areas, a fade at the first audit lapse, and resistance from people who see the bench and its contents as personal.

Where it goes wrong

The first failure is treating 5S as an event. A big clean-up before a visit looks good for a few weeks and then decays. The sign is audit scores that rise before each audit and fall afterward.

The second is auditing the look and missing the use. Teams score areas on tidiness and overlook whether the layout helps the work. The sign is a spotless cell where search time and changeover time have not moved.

The third is running it as a checklist. A program that audits labels and outlines captures the visible steps and misses the habits beneath them. The sign is staff who describe 5S as something they do for the auditor. A standard can also harden into rules for their own sake, so each area needs a way to change its layout when the work changes.

Related and rival frameworks

  • Lean Thinking. The improvement philosophy that 5S serves. Better to start there when the question is which wastes to attack first, since 5S only prepares the ground.
  • Poka-Yoke. Designs mistakes out of the task. Better when errors drive the losses more than clutter does, and easier once an orderly workplace makes the errors visible.
  • Gemba Walk. The leader's routine of looking at work where it happens. Better for keeping 5S alive, because it brings leaders to the floor every week.

Go to the source