Juran Trilogy

Layers of Management ThoughtLayer 6: Improvement PhilosophiesModelAlso known as Quality trilogy, Quality management trilogy, Planning, control, and improvement

Developed by Joseph Juran, whose Quality Control Handbook (1951) became the field's standard reference, and who set out planning, control, and improvement as a trilogy in The Quality Trilogy (1986), an article in Quality Progress.

Manages quality through three linked processes, planning it into products and processes, controlling it to hold the gains, and improving it to remove chronic waste, each with its own methods and its own owner.

Planning, control, and improvement, and what each does to a warehouse's cost of picking errors

The chart plots a warehouse's monthly cost of picking errors for a year. Planning sets the chronic level, control decides how long the spike after a software update lasts, and improvement cuts the chronic level from the month the project starts (in this simple model, at once). Move each setting and read the year's cost and how much of it is chronic. Illustrative.

$20K
2
Jul
50%
Cost of picking errors over the year, $K
$220K
Of that, chronic cost, $K
$180K
What the year's cost is mostly made of
Mostly spikes: control is the main leverMostly chronic: only planning and improvement can lower it

Monthly cost of picking errors, $K

0204060JanFebMarAprMayJunJulAugSepOctNovDec0204060JanFebMarAprMayJunJulAugSepOctNovDec

An example

A food distributor tracked picking errors in its warehouse and found that they cost about twenty thousand dollars a month in reshipments, credits, and extra labor. A spike after a software update pushed the figure to forty thousand for two months, and the operations manager's team was applauded when they brought it back down. Nobody asked why the baseline was twenty thousand in the first place.

The quality manager showed the monthly cost on one chart and named its parts. The spike was a control problem, solved by a quick response. The twenty thousand was chronic: it had been built into how the pick process was designed, and no amount of firefighting would remove it. She proposed a project to find and remove the root causes of chronic errors, and asked that the next pick process, for a new building, be planned with its controls from the start.

The project cut the baseline by half within a year, and the new building opened with a quarter of the old error rate.

The core idea

Juran described quality management as three processes that make up a trilogy. Quality planning creates something new, such as a product, service, or process, and designs it together with the controls that will produce it. Quality control keeps performance stable and within standard, correcting deviations as they appear. Quality improvement finds the root causes of chronic waste and removes them through deliberate, breakthrough change.

A chart ties the three together. It plots the cost of poor quality over time. Planning sets the chronic level the process starts with. A sporadic spike is an unplanned event, such as a breakdown or error, that control brings back to the chronic level. Improvement then lowers the chronic level well below where planning put it.

The insight is the distinction between the two kinds of loss. A spike is noticed and fixed. Chronic waste goes on and on until the organization decides to find its root causes, and it usually dwarfs the spikes. Each process needs different people, tools, and kinds of leadership.

The thinking behind it

Joseph M. Juran Joseph Juran was a quality engineer whose Quality Control Handbook, first published by McGraw-Hill in 1951, became the field's standard reference. He set out the trilogy in a 1986 Quality Progress article written for a crisis: companies were losing sales to foreign competitors on quality, and their upper managers, practiced at managing money, had little training in managing quality. His answer was one way of thinking for every function and level, with three processes parallel to the financial ones: planning like budgeting, control like cost control, improvement like cost reduction. He is also associated with fitness for use as the definition of quality, which makes the customer's need the test, where Crosby's conformance to requirements makes the specification the test.

Where it sits in the layers

The Juran Trilogy sits in Layer 6, Improvement Philosophies, because it holds a view of how quality improves, in three managed processes with distinct jobs. From Layer 1 it takes the feedback loop of Cybernetics, which its control process applies: measure, compare with the goal, act on the gap. Below it, Layer 7 systems such as ISO 9001 codify planning and control, and Layer 9 tools such as Statistical Process Control do the measuring. Six Sigma, a neighbor in Layer 6, supplies a method for its improvement process. The common mistake is asking one process to do another's job. Control applied to chronic waste only holds it in place, and improvement without planning leaves the next product with the same built-in errors.

How organizations put it to work

The trilogy is usually owned by the head of quality, with the chief executive sponsoring improvement projects and process owners responsible for planning and control. It changes structure by separating three kinds of work that firms usually blur: design teams plan quality in, operating teams control it, and project teams, often across functions, improve it. It changes decisions by requiring that a new product or process be planned with its controls, and that improvement projects be chosen by the cost of poor quality they address.

Its routines are a regular report of the cost of poor quality, a control plan for each process, and a pipeline of improvement projects, each with a leader, a team, and a target. Its measures are the cost of poor quality, process stability, and results by project.

Sustaining it takes executives who read the chronic cost as closely as the spikes, and who keep funding projects when firefighting seems more urgent. In the first year a leader should expect the first accounting of chronic waste to be a surprise, a few projects with large savings, and the discovery that some controls were missing. The business gains lower cost of failure, steadier performance, and new products that start closer to their target.

Where it goes wrong

The first failure is firefighting mistaken for quality. Teams that respond well to spikes are praised, and the chronic baseline is accepted as the normal cost of business. The sign is a reward for fixes and none for prevention.

The second is a poor measure of waste. If the cost of poor quality is not counted, or only the visible part is, projects are chosen by noise and savings cannot be shown. The sign is improvement projects with no baseline.

The third is a framework applied by rote. The trilogy gives three labels, and organizations can file their activities under them without changing how they are managed. The sign is a quality system with a planning document, a control chart, and an improvement team, none of which affects a decision.

Related and rival frameworks

  • Deming's 14 Points and System of Profound Knowledge. Roots quality in variation and in management's responsibility for the system, and rejects targets. The better pick when the trouble is the way people are managed.
  • Total Quality Management. Spreads quality through the whole company and its culture. The better pick when the aim is a company-wide program more than three processes.
  • Six Sigma. A project method for the improvement process, with statistical tools and trained leaders. The better pick when the chronic problem is a measurable defect.