Popularized by Michael George in Lean Six Sigma: Combining Six Sigma Quality with Lean Speed (2002); Barbara Wheat, Chuck Mills, and Mike Carnell had already published a book on the same combination, Leaning into Six Sigma, and the idea has no single owner.
Combines Lean's attack on waste and delay with Six Sigma's attack on variation and defects, so one improvement program shortens the time a process takes and also makes its output consistent.
Seven problems in the quote-to-order process, sorted by the tool each needs
Lean removes waiting and waste in the flow of work; Six Sigma reduces variation and defects. Select each problem the group finds, then the box it belongs in; the middle box holds the problems that need both. Show the sort to compare yours. Illustrative.
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
- Not placedPlacedLean: waste and delayBoth togetherSix Sigma: variation
Problems
The method that fits the problem
Your sort matched 0 of 7.Your sort matched 1 of 7.Your sort matched 2 of 7.Your sort matched 3 of 7.Your sort matched 4 of 7.Your sort matched 5 of 7.Your sort matched 6 of 7.Your sort matched 7 of 7.
- Lean: waste and delay
- The work waits or moves for no reason a customer would pay for. Map the flow and take out the waiting, hand-offs, and extra steps.
- Both together
- Defects cause delay, and delay hides defects. Fix the cause of the errors with data, then redesign the flow so work does not queue.
- Six Sigma: variation
- The output differs from run to run, and no one can say why. Measure it, find the sources of variation, and tighten the process.
The sort
- Quotes wait in queues: Lean: waste and delay. Waiting is waste. Removing approvals and reordering the queue cuts days with no new data.
- Errors return quotes: Both together. The error causes the wait. Fix its source with statistics and then change the flow, so a returned quote no longer goes to the back.
- Price varies by rep: Six Sigma: variation. A spread in output. Measure it, find which inputs drive it, and tighten the rule.
- Too many hand-offs: Lean: waste and delay. Extra steps are waste. A flow map shows which can be dropped.
- Lead times swing: Both together. The delay comes partly from queues and partly from variation, so both tools are needed.
- Spec sheets mismatch: Six Sigma: variation. A defect rate with unknown causes. A measurement study and a root-cause analysis suit it.
- Repeat data entry: Lean: waste and delay. Rework and duplicated motion are waste. Entering the data once removes both steps.
An example
A company that sold industrial valves took an average of eleven days to turn a quote into a confirmed order, and one quote in five contained an error that sent it back. Its Lean team had cut a few days by removing approvals, and its Six Sigma team had spent a quarter studying the error rate. Neither had touched the other's problem, and the two teams reported to different executives.
The new vice president for operations merged them. A single group began by mapping the whole path of a quote, and the map showed that most of the eleven days were spent waiting in queues, and that a large share of the waiting was caused by the errors: a returned quote waited again from the beginning.
The group fixed the data entry that produced the errors, using the statistical methods the Six Sigma team knew, and then reorganized the queue, using the flow methods the Lean team knew. Quotes closed in five days, with one error in twenty-five, and the two teams became one.
The core idea
Lean Six Sigma joins two improvement philosophies that grew up apart. Lean, from Toyota's production system, looks at a process as a flow of value and removes waste: waiting, rework, extra movement, and work that no customer wants. Six Sigma, from Motorola, looks at a process as a source of variation and reduces defects until the output is consistent.
The argument for combining them is that each handles what the other misses. A fast process that produces defects wastes the speed on rework, and a precise process that stalls in queues delivers late. In practice a Lean Six Sigma program uses Six Sigma's project structure, trained project leaders, and statistical analysis together with Lean's maps of the flow and its work to remove delay. The work is done by cross-functional project teams, usually led by staff trained in a belt system.
The insight is that time and quality are one problem seen from two sides, since defects cause delay and delay hides defects. A single program can work on both at once, with one set of measures.
The thinking behind it
Michael L. George Michael George is credited with popularizing the combination in corporate boardrooms through his 2002 book, Lean Six Sigma: Combining Six Sigma Quality with Lean Speed, published by McGraw-Hill. A second book, Lean Six Sigma for Service (2003), carried the idea into service work. He did not originate the combination alone: Barbara Wheat, Chuck Mills, and Mike Carnell had already published Leaning into Six Sigma, which one catalog dates to 2001. George's contribution was the case, made to executives, for running speed and quality as one program with one set of projects and measures.
Where it sits in the layers
Lean Six Sigma sits in Layer 6, Improvement Philosophies, because it prescribes how an organization improves its processes and merges two such philosophies in one. It takes from Layer 1 the idea of process variation as a source of trouble, and it relies on the parent philosophies, Lean Thinking and Six Sigma, which are also in Layer 6. Its work in Layer 9 is done with tools such as Value Stream Mapping and the DMAIC cycle, and in Layer 7 its progress is often assessed against quality standards. The common mistake is asking it to set strategy. It improves a process that already exists, and it will make a business that offers the wrong thing deliver the wrong thing faster and with fewer errors.
How organizations put it to work
Lean Six Sigma is typically owned by an executive sponsor and a program office that trains project leaders, assigns them projects, and tracks results. It changes structure by creating a cadre of trained staff, often in a belt system, who spend part or all of their time on improvement projects across functions. It changes decisions by asking that each project begin with a baseline measure, an agreed definition of the problem, and a financial or customer target.
Its routines are a project pipeline, reviews at each stage of a project, and a regular summary of savings and quality gains for the executive team. Its measures are cycle time, defect rate, cost saved, and customer satisfaction, tracked at the process level.
Sustaining it takes projects chosen for their link to the strategy, sponsors who remove obstacles, and finance staff who check the claimed savings. In the first year a leader should expect a first wave of projects with uneven results, a good deal of training time, and the quick discovery that data on the process is missing. The business gains processes that take less time, make fewer errors, and run the same way each time, which makes its output easier to predict.
Where it goes wrong
The first failure is certification without results. Belts are earned, programs are announced, and projects pick small problems that are easy to finish. The sign is a count of trained staff and a thin record of savings that finance has verified.
The second is a distorted Lean. Lean practitioners argue that the combination treats Lean as a set of speed tools and so misses its emphasis on learning and respect for people, and that the claim that Lean lacks quality methods is false. The sign is a program in which Lean means waste hunts and no one asks employees to improve their own work.
The third is the project machine. A heavy program can crowd out the daily improvement done by people on the floor, and it can spend effort on projects whose savings never reach the accounts. The sign is a pipeline of projects with no change in the company's overall cost or cycle time.
Related and rival frameworks
- Lean Thinking. Focuses on value, flow, and waste, and the habits of the production floor. The better pick when delay and waste, more than variation, are the problem.
- Six Sigma. Focuses on measurement and the reduction of variation through statistical projects. The better pick when defects and consistency are the main trouble.
- Theory of Constraints. Directs all effort at the one step that limits output. The better pick when a single bottleneck governs the whole process.
Go to the source
- Lean Six Sigma: Combining Six Sigma Quality with Lean Speed, McGraw-Hill, New York, 2002
- Lean Six Sigma for Service, McGraw-Hill, New York, 2003
- Leaning into Six Sigma, Barbara Wheat, Chuck Mills, and Mike Carnell; a McGraw-Hill edition followed in 2003, 2001