Developed by Rajan Suri, who founded the Center for Quick Response Manufacturing at the University of Wisconsin-Madison in 1993 and introduced the approach in Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times (1998).
Makes lead time, the clock time from order to delivery, the main target of a manufacturer, and shows that cutting it takes a different organization, with cells, spare capacity, and smaller lots.
Why a job shop that runs its machines flat out makes customers wait
A job needs 2 hours of work per part and moves in lots. In this simple queueing model the wait climbs steeply past about 85 percent utilization: the shop's old habits, 95 percent and lots of ten, give 400 hours, nearly all of it waiting. Set 80 percent and lots of three, as the shop did, and lead time falls to 30. Illustrative.
Lead time, hours
An example
A custom metal-parts shop with sixty people quoted five weeks for most jobs. The actual work on a typical job took about eleven hours, spread over a month of queues. Machines ran at ninety-five percent of capacity, because the owner counted any idle machine as lost money, and lots of ten parts were the habit, because setups were long.
The new general manager asked a different question: how long does a job wait? She mapped three typical jobs and found that over ninety percent of the time was waiting. Under her plan, the shop formed two cells, each holding the machines and people needed for one family of parts, and each owned its jobs from start to finish. Machines in each cell were loaded to about eighty percent, and lot sizes fell from ten to three.
Quoted lead time dropped from five weeks to nine days. The shop won two customers who had been going to a competitor with a three-week promise, and the cells' supervisors spent less time expediting and more time planning.
The core idea
Quick Response Manufacturing starts from a claim about competition: for many manufacturers, especially those that make custom or varied products, the time between a customer's order and delivery is the most valuable thing to cut. Reducing it applies to the time to manufacture and deliver existing products and to the time to introduce new ones.
Suri's later book groups the method under four concepts. The first is the power of time, felt across the whole enterprise. The second is an organization built for speed, with cells that own a family of jobs from start to end. The third is the system dynamics that link capacity, lot sizes, and waiting. The fourth carries all three beyond the shop floor to quoting, planning, purchasing, and product introduction.
The insight is that high utilization and large lots, the habits of cost accounting, lengthen lead time sharply. A system run near its capacity has jobs waiting most of the time, and QRM trades some apparent efficiency for speed.
The thinking behind it
Rajan Suri Rajan Suri, a professor of industrial engineering at the University of Wisconsin-Madison, founded the Center for Quick Response Manufacturing there in 1993, a joint venture between the university and manufacturing firms, and directed it into the late 2000s. He introduced the core concepts in his 1998 book, Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times, published by Productivity Press, and restated the approach in It's About Time in 2010. He also developed POLCA, a card-based way of releasing work in shops that make low-volume, high-variety, or custom-engineered products.
Where it sits in the layers
Quick Response Manufacturing sits in Layer 6, Improvement Philosophies, because it prescribes how a manufacturer should improve: by making time the target and restructuring the enterprise around it. From Layer 1 it takes the logic of Stocks and Flows: work waiting in a shop is a stock, and the larger it grows, the longer every job spends in it. Below it, Little's Law in Layer 9 supplies the arithmetic linking work in progress to time. Lean Thinking is a close relative in Layer 6, and Drum-Buffer-Rope in Layer 8 is a constraint-focused cousin. The common mistake is asking it to cut unit cost directly. QRM aims at lead time, and a firm that treats it as a cost program will keep filling its machines and lose the speed it was seeking.
How organizations put it to work
QRM is owned by the plant manager or general manager, with cell leaders who run each cell as a business with its own targets. It changes structure the most: functional departments of similar machines give way to cells, each with the people and machines needed for a family of jobs. It changes decisions by shifting the target from machine utilization to lead time, and by moving the schedule to the people in the cell.
Its routines are mapping the time a job takes from order to delivery, forming cells, setting lot sizes by the time they add, and using a signal system such as POLCA to release work according to the capacity ahead. Its measures are lead time, the share of time a job waits, and on-time delivery, with utilization read as a constraint instead of a goal.
Sustaining it takes accounting that does not reward full machines, training for cell members in several tasks, and an office that follows the same logic as the shop. In the first year a leader should expect resistance from managers who watch utilization and from finance, a first cell with large gains, and unease about machines that look idle. The business gains faster delivery, more reliable promise dates, and a shop that can handle a custom order without a crisis.
Where it goes wrong
The first failure is an old measure in a new structure. A shop forms cells but keeps scoring the machines on utilization, and managers fill them to the brim. The sign is cells whose lead times creep back up within a year.
The second is a method for one kind of firm. QRM suits high-mix, low-volume, and custom work, and it is less obviously suited to a plant that makes one product at a steady rate. The sign is a plant with stable demand that adds cells and sees little change in lead time.
The third is stopping at the shop floor. Orders still take days to quote, engineering changes take weeks, and purchasing releases late. Suri holds that QRM extends across the whole enterprise, offices included. The sign is a short shop lead time and a long order-entry time.
Related and rival frameworks
- Lean Thinking. Removes waste in a flow of repeated work. The better pick when volume is high and demand steady.
- Drum-Buffer-Rope. Paces all work to the bottleneck. The better pick when one machine clearly limits the shop.
- World Class Manufacturing. A broad program of manufacturing excellence across quality, cost, and flexibility. The better pick when a plant needs a wide agenda more than a focus on time.
Go to the source
- Quick Response Manufacturing: A Companywide Approach to Reducing Lead Times, Productivity Press, 1998
- It's About Time: The Competitive Advantage of Quick Response Manufacturing, Productivity Press, 2010