Morgan R. Walker

ThinkersEngineer

Works

  • Critical-Path Planning and Scheduling, Proceedings of the Eastern Joint Computer Conference, 1959

In Thinking Tools

Known for

An engineer at DuPont who, with James E. Kelley Jr. of Remington Rand, developed the critical path method in the late 1950s for planning and scheduling large projects.

Tools that draw on Morgan R. Walker (1)

Back to the thinkers