From Robert Rosen's Anticipatory Systems: Philosophical, Mathematical, and Methodological Foundations (1985), first set out in his papers On Anticipatory Systems (1978).
Defines an anticipatory system as one that carries a predictive model of itself or its surroundings and changes its behavior now according to what that model says will happen later.
A contact center staffs for an enrollment surge by reacting to its queue, or by acting on a forecast
New agents take about three weeks to reach the phones. Reacting to the queue (B1) lets calls pile up through the surge. Give the plan's weight to a forecast three weeks ahead and the backlog mostly never forms, until the forecast is wrong. Move the weight, then the error. Illustrative.
Calls a week, thousands
Calls the staff can answer, thousands
Calls waiting, thousands
Week 26 of 26
- Calls a week, thousands
- 140
- Calls the staff can answer, thousands
- 141
- Calls waiting, thousands
- 0
- B1, Reacting to the queue
- A longer queue raises the plan, which adds agents three weeks later, which shortens the queue. It corrects errors only after they happen. One negative (−) link: an odd count, so the loop balances.
- Forecast of calls
- The center's model of its surroundings: calls expected three weeks ahead, read from the known enrollment dates. The second slider makes it wrong.
- Staffing plan
- Calls the plan wants answered each week: current calls and the forecast in the slider's proportions, plus a quarter of the backlog.
- Agents on the phones
- Moves a third of the way to the plan each week, because hiring and training take about three weeks.
- Calls coming in
- 100 thousand a week, rising to 140 thousand between weeks 8 and 12 as enrollment opens.
- Calls waiting
- Grows whenever calls outrun the agents, and shrinks when agents outrun the calls.
An example
A health insurer's contact center staffed by watching its queue. When calls waiting climbed, the planning team requested more agents, who took about three weeks to hire and train. Every fall the enrollment surge played out the same way: the queue grew for a month before new agents reached the phones, then the center overshot and carried idle agents into the winter.
A new workforce manager changed what the plan responded to. Enrollment dates were known months ahead and call volume followed them closely, so she built a forecast of calls three weeks out, the time it took to hire, and staffed to the forecast with the queue as a correction. The next surge produced a fifth of the usual backlog. The year after, a benefit change sent volume far above the forecast, and the center ran a backlog for weeks, worse than the old method, because the plan trusted a wrong model. From then on, the forecast's error was reported every Monday beside the queue, and the plan's weight on the forecast fell whenever the error grew.
The core idea
Robert Rosen defined an anticipatory system as "a system containing a predictive model of itself and/or of its environment, which allows it to change state at an instant in accord with the model's predictions pertaining to a latter instant": it acts now on what its model says will happen later. Most control is reactive: a thermostat, a reorder point, or a manager watching a queue acts on an error that has already happened, so delays in the system turn into lags and overshoots. An anticipatory system acts on an error that has not happened yet, because its model says it will. Living things are full of such models, from a plant hardening before a frost to an animal bracing before a blow.
An anticipatory system is only as good as its model, and when the model is wrong, the system acts confidently on a future that will not arrive. For an organization, that makes the forecast part of the control system, and the forecast's error a measure to manage as closely as the outcome it serves.
The thinking behind it
Robert Rosen Robert Rosen, a theoretical biologist and later professor of biophysics at Dalhousie University, wrote Anticipatory Systems: Philosophical, Mathematical, and Methodological Foundations in the mid-1970s, and it appeared in 1985, after papers that began with On Anticipatory Systems (1978). He treated anticipation as a mark of living things, which carry encoded models of themselves and their surroundings and act on them, so that a modeled future shapes behavior in the present. Because the model sits inside the system, he argued, a science of such systems needs a theory of modeling itself: what makes a model a faithful stand-in for what it represents, and how it fails.
Where it sits in the layers
Anticipatory systems sit in Layer 1, Metatheories of System Behavior, because the theory describes a kind of control any system can have, whether organism, machine, or company. It extends Cybernetics, whose feedback acts on errors already made, with control that acts on errors predicted, and it sits beside the Free Energy Principle in the same layer, which treats organisms as prediction machines. Below, it is put into practice by Scenario Planning and rolling forecasts, and it draws on Layer 3's Sensemaking, which builds the shared picture of a situation that any forecast rests on. The common mistake is treating it as forecasting advice. The theory concerns how a model becomes part of a system's behavior, including the ways a wrong model makes the system fail.
How organizations put it to work
In a company, anticipation is put to work wherever a plan acts on a forecast: workforce planning, inventory, capacity, and cash. The owner is the planning function, together with the operation it serves. The framework changes three things. The forecast horizon is set by the system's delay, so a plan that takes three weeks to change looks at least three weeks ahead. The forecast is treated as part of the control system, so its error is measured, reported beside the outcome it serves, and owned by someone. And the plan blends prediction with reaction, keeping a correction from actual results, so a wrong forecast cannot carry the operation far off course.
Sustaining it takes a forecast reviewed against outcomes every cycle, and a rule for how much weight the plan gives the forecast as its accuracy changes. In the first year, expect smaller peaks of backlog or stockout, fewer emergency hires and expedites, and at least one costly miss when the forecast was wrong, which is the moment to set how far the plan should trust its model.
Where it goes wrong
The first failure is trusting the model completely. A plan that steers only by forecast has no way to notice it is wrong until the damage is done. The sign is a staffing or inventory plan with no correction from actual results.
The second is anticipation that changes what it predicts. A published forecast can shape the behavior it forecasts, as when a predicted shortage brings hoarding. The sign is a forecast that comes true for reasons the model does not contain.
The third is a horizon shorter than the delay. A forecast of next week does nothing for a decision that takes a month to act on. The sign is a forecasting team praised for its accuracy while the operation still lurches between shortage and excess.
Related and rival frameworks
- Cybernetics. Feedback control that acts on errors already made. Simpler and more robust when delays are short and the future is hard to model.
- Scenario Planning. Builds several futures where a forecast commits to one. The better pick when the model's own assumptions are in doubt.
- Free Energy Principle. A later theory that treats every living system as reducing surprise by predicting its inputs, a broader form of the same idea.
Go to the source
- Anticipatory Systems: Philosophical, Mathematical, and Methodological Foundations, Pergamon Press; second edition, Springer, 2012, 1985
- On Anticipatory Systems: I. When Can a System Contain a Predictive Model of Another?, Journal of Social and Biological Structures 1(2), 155 to 162, 1978