Developed inside General Electric after its Work-Out program of 1989 to 1990, when Jack Welch had consultants study the best practices in managing change; no single author is credited.
Treats the success of a change as the quality of the technical solution multiplied by people's acceptance of it, and gives seven steps for building acceptance, from leading change to changing systems and structures.
A change's effectiveness is quality times acceptance, and the weaker factor is where a point goes furthest
A new quoting tool, rated 1 to 10 on how good it is and on how fully sales teams have taken it up. Effectiveness is the product, shown out of 10 in the bars. Set both ratings and read what one more point on each would add. Raise the weaker factor first. Illustrative.
Rating out of 10 (effectiveness scaled to 10)
An example
A manufacturer rolled out a new quoting tool to its sales teams. Engineering had built it carefully: it priced faster and more accurately than the spreadsheets it replaced, and the pilot numbers were excellent. Eight months later fewer than a third of the quotes went through it, and regional managers kept their own spreadsheets running in parallel.
The program lead drew two numbers on a whiteboard. She scored the tool's quality at 8 out of 10, and its acceptance, judged from usage and from conversations with reps, at 3. Multiplied, the two gave 24 out of 100. Raising quality by a point would add 3. Raising acceptance by a point would add 8. She stopped engineering work on new features and spent the next quarter on the acceptance side: having the sales vice president use the tool in every pipeline review, adding two respected reps to the design group, and retiring the old spreadsheets on a published date.
The core idea
The Change Acceleration Process starts from an equation. The effectiveness of any project equals the quality of the technical solution times the acceptance of the solution by the people involved. Because the two are multiplied, a strong solution that nobody adopts scores low, and so does a popular one that does not work. In the framework's telling, most organizations pour their effort into quality, and the equation says the larger return is often on the acceptance side.
The process then gives a sequence for building acceptance. Its seven elements, as commonly described, are leading change, creating a shared need, shaping a vision, mobilizing commitment, making change last, monitoring progress, and changing systems and structures. They run through a project from the opening decision to the point where the new way is built into how work is done. It is best read as a checklist of the people side of a project that a technical plan leaves out.
The thinking behind it
General Electric's in-house change practice, built after the Work-Out program of 1989 to 1990 General Electric launched its Work-Out program in 1989 and 1990, and the company found that the program was being implemented too slowly. Jack Welch, then chief executive, had consultants study the best practices in managing change, and the result was the Change Acceleration Process. The framework is practical, intended to be taught to managers and applied project by project. No individual author is credited, and later consulting firms and trainers have taught it widely, so versions differ in detail.
Where it sits in the layers
The Change Acceleration Process sits in Layer 8, Methodologies and Operating Systems, because it tells a project team what to do and in what order: seven elements, from leading change to changing systems and structures, run alongside the technical work. It takes for granted the view of general systems theory in Layer 1 that an organization's technical and human parts form one system, and it is close kin to sociotechnical systems, the Layer 6 philosophy of designing the two together. Below, it is put into practice with tools such as the RACI matrix in Layer 9 and routines such as the monthly business review in Layer 10, where progress is monitored. The common mistake is asking it to supply the technical solution. It governs how a solution gets adopted and has nothing to say about whether the solution is the right one.
How organizations put it to work
Companies adopt this as a standard way of running change, usually owned by an internal change team or by the transformation office, with the project sponsor accountable for each element. It changes structure a little: each major project has a named change lead next to the technical lead. It changes decisions, since a project is not approved without a plan for acceptance as well as one for the technical work. It changes routines, in that sponsors and teams check progress against the seven elements at each review. And it changes measures: adoption, such as the share of quotes that go through the new tool, sits beside the milestones for the build.
Sustaining it takes a trained group of change leads, a few templates for the common tools, and sponsors willing to spend their own time on the people side. It lasts where leaders ask about acceptance in every review.
In the first year a leader should expect the first projects to run slower at the start and faster at the end, and to learn how much of what had been called resistance was missing information or an unfinished design. The return is fewer launches that quietly fail, and less dependence on one charismatic sponsor.
Where it goes wrong
The first failure is false precision in the equation. Quality and acceptance are scored 1 to 10, and the product looks like a measurement. It is a conversation starter, and the sign is two managers arguing about whether acceptance is a 4 or a 5.
The second is the checklist as ritual. Teams tick off the seven elements, each with a template, without changing the way they work. The sign is a project with a complete change plan and no change in behavior.
The third is its corporate origin. It came out of a very large industrial company, and it can feel heavy in a smaller firm. The seven elements are also described in more than one order in different sources. The sign is a small team spending longer on the tools than on the change.
Related and rival frameworks
- Kotter's 8-Step Change Model. Gives eight steps for leading a large transformation, with strong emphasis on urgency and the guiding coalition. The better pick when the problem is leadership energy.
- Prosci Change Management. Adds a certified process and a way to assess individual adoption. Use it where a company wants outside tooling and training.
- Beckhard-Harris Change Formula. A short check of whether dissatisfaction, vision, and first steps are strong enough. A quicker diagnostic when the full process is too much.
Go to the source
- Change Acceleration Process (CAP), iSixSigma dictionary, 2024