Developed by Prosci, the change management firm founded in 1994 by Jeff Hiatt, from its own research into what makes change projects succeed; the methodology joins the ADKAR model, the Prosci Change Triangle, and a three-phase process.
Packages change management as a repeatable methodology: a three-phase process for planning and running the people side of a project, the ADKAR model for individuals, and the Change Triangle for judging a project's health.
A loan platform project, checked on the four sides of the Change Triangle by the team and the sponsor
Each of the four factors is scored 1 to 5 by the project team and by the sponsor. Compare the two columns: the gap on sponsorship is the finding. Change a score and read the overall verdict and the list of sides from strongest to weakest. Illustrative.
Success: the goals and the case for the project are clear
Project teamSponsorAverage4.0Leadership: the sponsor is active and visible to the front line
Project teamSponsorAverage3.0Project management: scope, schedule, and cost are under control
Project teamSponsorAverage4.5Change management: someone owns the people side, with a plan
Project teamSponsorAverage2.5Overall project health3.5
VerdictScore every row to see the verdict.At riskFix the weakest side before the next gate.WatchClose the gaps between the two views, starting with the weakest side.On trackKeep checking at each gate.
Sides, strongest first
- 4.5Project management: scope, schedule, and cost are under control
- 4.0Success: the goals and the case for the project are clear
- 3.0Leadership: the sponsor is active and visible to the front line
- 2.5Change management: someone owns the people side, with a plan
An example
A bank was replacing its loan origination platform. The project office tracked scope, schedule, and cost and had reported green for nine months. A change lead brought in a short health check built on four questions: were the goals of the project clear, was the sponsor active, was the project well run, and was anyone managing the people side?
The project team and the sponsor each scored the four. They agreed on the goals and on the project's management. They disagreed on sponsorship: the sponsor, who attended every steering meeting, rated it high, and the team rated it low, because no one on the front line had seen or heard from the sponsor about why the change mattered. The people side scored low from both. The sponsor agreed to visit three branches and explain the case for change in person, and the project added a change plan with an owner. A second check six weeks later showed the gap closing, and the first branches went live with the loan officers prepared.
The core idea
Prosci's methodology rests on three parts. The Prosci Change Triangle describes four factors that determine whether a change succeeds: success, meaning what a good outcome looks like and the case for it; leadership and sponsorship, meaning direction and accountability; project management, meaning the technical work of designing and delivering the solution; and change management, meaning the people side that helps individuals engage with, adopt, and use the solution. The Prosci 3-Phase Process is the sequence of work: prepare the approach, manage change, and sustain outcomes. ADKAR is the model for how an individual moves through a change.
The insight is that change management is a discipline with its own plan and owner, tied to the project. A project can be well managed and still fail for want of sponsorship or people-side work. Prosci says its models and tools come from best-practice research on what change leaders do that works. The offering is also a package, with certification, training, and assessments, which makes it attractive to organizations that want a standard approach.
The thinking behind it
Jeff Hiatt Jeff Hiatt founded Prosci in 1994, after a career as an engineer and program manager at Bell Labs, according to the firm's own account. The firm describes its approach as studying change leaders, noting what works and what does not, and says all of its models, tools, and training come from that research. Hiatt set out the individual-level model, ADKAR, in a 2006 book. The problem the methodology answered was practical: organizations that managed projects well but treated the people side as an afterthought, and that had no common language or process for it. Prosci's offering is a standard that a company can adopt across projects.
Where it sits in the layers
Prosci's approach sits in Layer 8, Methodologies and Operating Systems, because it says what to do, in what order, and who does it: a three-phase process with deliverables, a defined sponsor role, and certified practitioners. It takes for granted from the layers above an explanatory account of how people move through change, its own ADKAR model in Layer 5, and it sits under a maturity assessment of its own in Layer 7, the Prosci change management maturity model. It runs beside the project disciplines of this layer, such as the PMBOK guide, which it assumes will cover time, cost, and scope, and its sponsor work is practiced in the all-hands meeting in Layer 10. The common mistake is asking it to manage the project. It governs the people side, and the technical delivery stays with project management.
How organizations put it to work
Companies adopt Prosci as a standard approach, usually through a change management office or center of excellence, with project sponsors accountable on each project and certified practitioners supporting the work. It changes structure: a change function exists beside the project office, and large projects have a named change lead. It changes decisions: a project is not approved without a change strategy, and the sponsor commits to a defined role. It changes routines. Projects run a change strategy and plan through the three phases and assess project health at intervals with the triangle. And it changes measures: adoption and usage are tracked, as well as milestones, with review at each gate.
Sustaining it takes investment in training and in practitioners who are trusted, and sponsors who accept an active role. The certification pathway gives it a reliable supply of people, at a cost.
In the first year a leader should expect the first projects to be uneven, since sponsors resist the time the role takes. The return is a common language across projects, fewer launches that quietly fail, and less dependence on the personal skill of whichever manager leads each project.
Where it goes wrong
The first failure is the program as paperwork. Teams complete the deliverables of each phase, strategy, plan, and closeout, and the people side does not change. The sign is a binder of change plans and the same resistance at go-live.
The second is relying on a commercial package. The methodology, training, and tools are sold by the firm that developed them, and Prosci says its models come from its own research, so most of the evidence for them comes from the vendor. The sign is a business case that cites vendor benchmarks without independent comparison.
The third is the sponsor gap. The method depends on a sponsor who is visible and active, and sponsors may rate their own contribution higher than the team does. The sign is a triangle assessment where the leadership side shows a wide gap between the two views and no one acts on it.
Related and rival frameworks
- ADKAR Model. The individual-level piece of the methodology, usable alone. Take it when the question is why a particular group has not moved.
- Kotter's 8-Step Change Model. A leader's sequence for a large transformation, free of certification or tools. The better pick when the need is for energy and a guiding coalition.
- GE Change Acceleration Process. A large company's own approach, with the effectiveness equation as its core. Close in aim, and built for a single firm's projects.
Go to the source
- The Prosci 3-Phase Process, Prosci, 2024
- The Prosci Change Triangle (PCT) Model, Prosci, 2024
- Who We Are, Prosci, 2024
- ADKAR: A Model for Change in Business, Government, and Our Community, Prosci Learning Center Publications, Loveland, Colorado, 2006