Compiled by the Project Management Institute, whose board approved its first body of knowledge in 1987 and which published the first PMBOK Guide in 1996 and a seventh edition in 2021.
A body of knowledge from the Project Management Institute that sets out common terms and practice for managing projects, organized in earlier editions as process groups and knowledge areas, and in its seventh as principles and domains.
A plant-expansion project scored for gaps against the ten knowledge areas
A body of knowledge works as a completeness check. Score how serious the gap is in each of the ten areas, from 1 (no gap) to 5 (severe). The average gives the verdict, and the ranked list puts the worst gaps first, which is where a project review should start. Illustrative.
Integration: no plan ties areas together
ScoreScope: inclusions not written down
ScoreSchedule: dates not tied to scope
ScoreCost: spending not checked against budget
ScoreQuality: no acceptance criteria or checks
ScoreResource: people and equipment not ready
ScoreCommunications: no regular updates
ScoreRisk: threats not listed, owned, reviewed
ScoreProcurement: suppliers not held to terms
ScoreStakeholders: those affected not engaged
ScoreAverage gap2.9
VerdictScore every row to see the verdict.Well coveredEvery area has a working practice. The remaining question is whether the practices are used.Gaps to closeThe project is run, but some areas are thin. Start with the highest scores below.Major gapsSeveral areas are barely managed. Pause new commitments and build the missing basics.
Worst gaps first
- 4.0Quality: no acceptance criteria or checks
- 4.0Risk: threats not listed, owned, reviewed
- 4.0Stakeholders: those affected not engaged
- 3.0Integration: no plan ties areas together
- 3.0Cost: spending not checked against budget
- 3.0Communications: no regular updates
- 2.0Scope: inclusions not written down
- 2.0Schedule: dates not tied to scope
- 2.0Resource: people and equipment not ready
- 2.0Procurement: suppliers not held to terms
An example
A manufacturer was expanding its main plant, and the project manager was an engineer who had never run a project of this size. The first months went well on the work he understood: the building, the equipment, and the schedule. Then a supplier's delivery slipped, the finance team found the budget did not cover the commissioning period, and the union learned of a shift change from the grapevine. Each problem was in an area no one had been watching.
The company's project office handed him a checklist of ten areas, drawn from a recognized body of knowledge, and asked him to score the project on each. Three showed the worst gaps: quality, risk, and the people affected. He had no acceptance criteria, no risk list, and no plan for telling the workforce. Over the following month he wrote each of them. The late delivery was now an item on the risk list with an owner, the commissioning budget was added through a change request, and the shift change was announced properly.
The core idea
The PMBOK Guide gathers what the Project Management Institute treats as good practice in managing projects, so that people across industries share terms and a method. In its sixth edition the guide organized the work in two ways. Five process groups follow the life of a project: initiating, planning, executing, monitoring and controlling, and closing. Ten knowledge areas cover the subjects a project manager must handle: integration, scope, schedule, cost, quality, resource, communications, risk, procurement, and stakeholder management.
Together the groups and areas form a grid of processes, each with inputs, outputs, tools, and techniques. The seventh edition, published in 2021, replaced the groups and areas with project management principles and performance domains, because PMI found the earlier guide had grown large and hard to follow. The underlying idea persists across editions: projects fail in predictable places, and a shared inventory of those places helps a manager avoid overlooking one.
The thinking behind it
Professional association practice, collected by the Project Management Institute The Project Management Institute was founded in 1969. A 1983 committee report proposed a code of ethics and six knowledge areas, and in 1987 the board approved the first body of knowledge, which had grown to eight areas with the addition of contract and procurement and of risk management. The first PMBOK Guide appeared in 1996, and it was the first edition built around processes with inputs, outputs, tools, and techniques. The American National Standards Institute approved it as a standard in 1999. The sixth edition in 2017 added more on agile methods, and the seventh in 2021 replaced the older structure with principles. No single author is credited.
Where it sits in the layers
The PMBOK Guide sits in Layer 8, Methodologies and Operating Systems, as a body of practice that organizes project work, although it prescribes less than a single method such as PRINCE2 does. It takes for granted that work can be organized as projects with a beginning and an end, and the conviction of scientific management in Layer 6 that good practice can be written down and taught. It is put to work through tools in Layer 9 such as the work breakdown structure and the risk register, and through the review routines of Layer 10. The common mistake is asking it to supply judgment. It lists what to consider, and a manager who follows it faithfully can still run the wrong project or ignore its tailoring advice.
How organizations put it to work
A project management office or a head of delivery usually owns it, and a manager is named to see that every project follows it in a proportionate way. The guide changes the common language: projects are described by the same terms, scoped and risk-assessed in the same way, and reviewed against the same list. It changes routines, with standard templates for charters, plans, and reports, and decisions are made at stage reviews.
The measures are coverage and compliance, such as whether every project has a risk list and an approved plan, together with outcomes like cost and schedule against baseline. Sustaining it takes tailoring: leaders must decide which parts apply to a small project and which to a large one. In the first year, expect a gain in consistency, templates that multiply, and some resentment from experienced managers who see paperwork. The business gains less dependence on the personal habits of individual project managers, and executives can compare projects on a common footing.
Where it goes wrong
Failure often starts with paperwork in place of judgment. Teams produce every document and none of the thinking, and a project passes its reviews while heading for failure. The sign is plans that look alike across very different projects.
It also comes from the weight of the guide itself. PMI found that earlier editions had grown large and hard to understand, which is why the seventh moved to principles and domains. A small project forced through the full set of processes pays more in overhead than it gains. The sign is a project office slower than the work.
And there is the fit with agile and uncertain work. A process-heavy approach assumes the scope can be planned up front, and the sixth edition's addition of agile material was an acknowledgment of the gap. The sign is a team that follows the plan after the facts have changed.
Related and rival frameworks
- PRINCE2. A complete method with defined roles, stages, and a business case. The better pick when an organization wants one prescribed way to run projects.
- Earned Value Management. A way to measure cost and schedule performance together. Use it inside a project run to this guide when the numbers need a common test.
- Disciplined Agile. A toolkit for choosing methods across agile and traditional work. A good choice when the guide is too heavy for the projects at hand.
Go to the source
- A Guide to the Project Management Body of Knowledge (PMBOK Guide), Project Management Institute, 1996