No single originator: a long-standing Japanese practice of building agreement informally before a formal decision, which Toyota teaches as part of the Toyota Production System and which scholars such as Michael Wolfe (1992) have analyzed together with the formal ringi process.
Holds that a decision should be settled in advance through quiet one-on-one conversations with everyone it touches, so the formal meeting confirms an agreement that already exists.
Weeks to a working change, with and without groundwork, for a decision touching ten people
Each conversation before the meeting costs half a week and surfaces any objection while it is cheap to fix. An objection that first appears after the meeting costs four weeks. It opens with everyone consulted first, as in the example. Set how many stakeholders there are and what share of them are consulted. The chart shows the weeks to the formal decision and to a working change. Illustrative.
Weeks to the formal decisionWeeks to a working change
An example
A distribution company wanted to merge three regional warehouses into two. The last two attempts had died in the boardroom, each time after a polite meeting and a quiet no in the weeks that followed. This time the sponsor, a senior operations manager, brought no proposal. For three weeks she met each depot lead, the finance director, two union representatives, and the transport planner, one at a time and sometimes over lunch. She described the problem and asked what would make a merger fail. A depot lead told her that the night shift could not move without its subsidized transport. The finance director wanted the savings to show in the first year. She revised the plan twice. The formal meeting lasted fifteen minutes and passed without a question. Implementation took ten weeks, against six months for the earlier attempts.
The core idea
Nemawashi is a Japanese word that literally means going around the roots, as a gardener does when preparing a tree for transplant. In management it names the informal groundwork done before a formal decision. Information about an upcoming decision is shared with those it will affect, so they can give their views first. The person with the idea approaches key stakeholders one at a time or in very small groups, learns whether they reject it, like parts of it, or have ideas for improving its chances, and refines the plan over several rounds. The result is either a proposal likely to succeed or a clear sign it will not be approved. When the formal meeting comes, the decision is close to a formality. Toyota calls it the first step in making a decision and says that, done well, it lets a change go ahead with everyone's consent. The insight is that agreement is cheaper to build before a proposal is public than after.
The thinking behind it
Japanese management practice, taught at Toyota and studied in decision research Nemawashi has no single originator. It is an everyday practice in Japanese organizations, and Toyota teaches it within the Toyota Production System as the informal groundwork that builds agreement before any formal change. Researchers have treated it together with ringi, the formal route by which a proposal circulates for approval. Michael Wolfe's 1992 paper in Decision Support Systems gave a theoretical justification for both and described a group decision support system built on them. A Bain and Company blog describes a case in which the time went mostly to deciding and little to implementing, nearly the reverse of the author's American experience.
Where it sits in the layers
Nemawashi sits in Layer 10, Practices and Rituals, because it is a routine that runs before a formal decision: one-on-one conversations with everyone a proposal touches. It assumes the Layer 3 view that economic life is embedded in relationships, which Embeddedness describes, and the long-term ties that national-culture work such as Hofstede's Cultural Dimensions in Layer 4 associates with Japan. In many Japanese firms it prepares the ground for Ringi-sei, the Layer 6 system of written approval, and it supports Layer 8 methods such as Hoshin Kanri. Beside it in Layer 10 sits Catchball, the exchange of targets between levels. The common mistake is to ask it to replace judgment, or to treat a routine for one decision as a system of governance. It builds agreement for a proposal, and it does not say whether the proposal is a good one.
How organizations put it to work
A senior leader or a decision sponsor owns it, one proposal at a time, and the head of a function usually trains others in the habit. Structure changes little. Decisions change in sequence: no consequential proposal reaches a formal meeting until its sponsor has spoken to those affected and recorded what was heard. Routines include a stakeholder list for each proposal, a round of one-on-one talks, a revision after each round, and a short formal meeting at the end. Measures follow the process: how many objections surfaced before the meeting, how many after, and how long implementation took. Sustaining it takes patience with a slow start and honest listening, since a sponsor who is only gathering signatures will be seen through. In the first year, expect decisions to take longer to reach a meeting, implementation to speed up, and a few leaders to complain that the hallway has replaced the boardroom.
Where it goes wrong
The first failure is hidden power. If only the senior or the loud are consulted, the groundwork is a way of collecting agreement from those who already hold it. The sign is a proposal that arrives at the meeting with every senior person aboard and the people who must carry it out unaware. The second is delay. The early phase is slow, and the Bain account says it pays only when the decision is consequential enough to justify the investment. The sign is a modest change that took two months of conversations. The third is the criticism that consultation can be hollow: those consulted may feel they have little choice but to agree, which makes the consensus thinner than it looks. The sign is a quiet no that comes back after the formal approval.
Related and rival frameworks
- Ringi-sei. The formal counterpart, in which a written proposal circulates for approval. The better pick when the need is a record of who agreed.
- Catchball. A two-way exchange of targets between levels. Narrower than nemawashi and tied to a planning cycle, so the better pick when the issue is setting goals.
- Guanxi-Based Management. Also builds on personal relationships, with obligations that run over longer periods than one decision. Read it for the wider network that makes the conversations possible.
Go to the source
- What is nemawashi? Toyota Production System guide, Toyota UK, mag.toyota.co.uk
- A theoretical justification for Japanese nemawashi / ringi group decision making and an implementation of a nemawashi / ringi group decision support system, Decision Support Systems (Michael D. Wolfe), 1992