Developed by the TMMi Foundation, founded in 2010 by test and quality experts, which published the first stable version of the TMMi specification (version 1.0) in 2012; it builds on the earlier Test Maturity Model and was inspired by CMMI.
Rates how mature an organization's software testing is on five staged levels, from ad hoc testing to continuous improvement aimed at preventing defects, with each level requiring every process area beneath it to be in place.
A level of test maturity counts only when every level beneath it is in place
Four groups of practices, one for each level above the first, as set at a payments software team before its first assessment. Set each group to In place or Not yet: the rating is the highest level with nothing missing beneath it. Illustrative.
Level 2: test approach managed
Level 3: one standard process
Level 4: testing measured
Level 5: improving to prevent
- No conflict in this combination.Rated Level 1, ad hoc. Testing depends on who is on the team, and nothing above this gap counts until a test policy and strategy exist and each project plans its testing.Rated Level 2, managed. Each project plans and controls its testing in its own way. Anything in place above the missing standard process waits until it closes.Rated Level 3, defined. Every project follows one standard, with testing built into development. Measurement comes next.Rated Level 4, measured. Test process and product quality are measured throughout. The last step is improving to prevent defects.Rated Level 5, optimization. Testing is assessed and improved continuously, with a focus on preventing defects.
- Rated Level 1, ad hoc. Testing depends on who is on the team, and nothing above this gap counts until a test policy and strategy exist and each project plans its testing. (managed: Not yet)
- Rated Level 2, managed. Each project plans and controls its testing in its own way. Anything in place above the missing standard process waits until it closes. (managed: In place, defined: Not yet)
- Rated Level 3, defined. Every project follows one standard, with testing built into development. Measurement comes next. (managed: In place, defined: In place, measured: Not yet)
- Rated Level 4, measured. Test process and product quality are measured throughout. The last step is improving to prevent defects. (managed: In place, defined: In place, measured: In place, optim: Not yet)
- Rated Level 5, optimization. Testing is assessed and improved continuously, with a focus on preventing defects. (managed: In place, defined: In place, measured: In place, optim: In place)
An example
A payments software company had four product teams that each tested differently. One relied on a few senior engineers who knew where the bugs hid. Another had a large automated suite that nobody trusted. Defects found by customers had doubled in a year, and the chief technology officer could not say which team was riskiest, because they counted defects in four different ways.
She commissioned an assessment against the five levels of the Test Maturity Model integration. Three teams rated at the first level and one at the second. The finding was specific: no team had a test policy or strategy written down, so each team's approach depended on who was on it. The company did not buy a better test tool. It wrote one test policy and one strategy, defined how defects would be counted, and made every team's plan reviewable. Six months later it could compare the four teams, and the team with the large suite learned that most of its automated tests covered low-risk screens.
The core idea
TMMi treats testing as a process that matures in a fixed order. At the first level, testing is ad hoc and rests on individuals. The second brings management to each project, starting from a written test policy and strategy. The third gives every project one standard process and builds testing into development itself. The fourth measures both the test process and the quality of the product, and the fifth uses those measures to improve continuously, with the aim shifting from finding defects to preventing them.
Each level carries process areas, with specific goals and practices beneath them: sixteen areas, fifty goals, and 173 practices in all. A level counts only when every area at it and below it is in place, so levels cannot be skipped. The insight is that reliable testing comes from a managed process before it comes from tools, and that a company can go wrong by automating a process it has never defined. The model is generic across lifecycle models.
The thinking behind it
The TMMi Foundation, a non-profit of test and quality experts founded in 2010 No single author stands behind the model. Its roots reach back to Gelperin and Hetzel's evolutionary testing model of 1988 and to an early test improvement model called the Test Maturity Model. Seeing a need for a more established model, several volunteer test and quality experts, mainly in Europe, founded the TMMi Foundation in 2010. The foundation published the first stable specification, version 1.0, in 2012, and version 1.2 followed in 2018. It describes itself as a non-profit dedicated to improving software quality management and test processes. TMMi was originally inspired by CMMI, and its assessments are carried out by accredited assessors, who rate testing processes against the levels.
Where it sits in the layers
The model sits in Layer 7, Assessment and Maturity Models, because accredited assessors rate a testing practice against staged requirements. It borrows its logic from CMMI, which staged process maturity for software engineering, and it serves delivery philosophies such as Continuous Delivery in Layer 6, whose speed makes untested change costly. Below it, DevOps in Layer 8 and habits such as the Pull-Request Review in Layer 10 are where its practices run day to day. The common mistake is asking it to decide how much testing a product needs. It rates how well testing is managed. The amount of testing that fits a product's risk is a decision for the business that owns the product.
How organizations put it to work
A head of quality or engineering usually owns the model, and a test manager runs the program. Adoption begins with an assessment, by the company or accredited assessors, followed by a roadmap that targets the next level's process areas in order. It changes structure by giving testing a policy and a strategy that sit above any one project, and it changes decisions by making release readiness depend on agreed test measures. Routines follow: reviewable test plans, a common way to count defects, and a regular review of testing results across teams.
Sustaining it takes executive attention to testing as a discipline instead of a last phase, and a training habit for testers. In the first year, a leader should expect the assessment to place the company a level below its own belief, early work that is mostly writing and agreeing definitions, and resistance from teams that see it as paperwork. The return is fewer defects reaching customers, more predictable releases, and testing that does not depend on the few engineers who know where the problems are.
Where it goes wrong
The first failure is the level as a badge. A company pursues a rating for a contract and builds documents to satisfy the assessor. The sign is a test policy no tester has read.
The second is process before judgment. Following the practices does not make the tests good, and a team can meet every goal at a level while its tests miss the risky parts of the product. The sign is a high rating and customer-found defects that stay flat.
The third is the weight of a staged model on fast-moving teams. Requiring every process area of a level before moving on can slow teams that already work well in some areas and badly in others. The sign is teams waiting on a level-two gap while their release pipeline is ahead of the model. Evidence of benefit comes mainly from a survey of certified companies, which chose to take part.
Related and rival frameworks
- CMMI. The broader process maturity model that inspired this one. Pick it to rate how an engineering organization builds software, and TMMi to rate how it tests it.
- Capability Maturity Model for Software. The original staged model for software process maturity. It is the historical root of the staged approach and is largely superseded.
- ISO 9001 Quality Management System. A certifiable standard for a quality management system across a whole organization. It is the better pick when a customer asks for a general certificate, and TMMi when the question is how mature testing is.
Go to the source
- Motivations for and Benefits of Adopting the Test Maturity Model integration (TMMi), Software Quality: The Next Big Thing in Software Engineering and Quality, SWQD 2022 (van Veenendaal, Garousi, and Felderer), 2022
- The TMMi model, TMMi Foundation, 2025