From the process maturity framework of Watts S. Humphrey (Characterizing the Software Process: A Maturity Framework, 1988), which the Software Engineering Institute at Carnegie Mellon built into the Capability Maturity Model for Software (1991) and then, with partners in government and industry, integrated as CMMI (2000).
Rates the maturity of an organization's processes on a staircase of five levels, from unpredictable to continuously improving, where each level counts only once every level beneath it is in place.
A maturity level counts only when every level beneath it is in place
Four groups of practices, one for each level above Initial, set as a software contractor stood before its first appraisal. Set each group to In place or Not yet: the rating is the highest level with nothing missing beneath it. Illustrative.
Managed: each project planned and run
Defined: one standard process, tailored
Quantitatively managed: run by numbers
Optimizing: improving from its own data
- No conflict in this combination.Rated Initial. Results depend on who runs each project, and nothing above this gap counts until every project is planned and controlled.Rated Managed. Projects are under control, each in its own way. Anything in place above the Defined gap is set aside until that gap closes.Rated Defined. Every project tailors one standard process, so results compare across projects. Anything above waits until performance is run by the numbers.Rated Quantitatively Managed. Performance is predictable within limits the data sets. The last step is narrowing those limits on purpose.Rated Optimizing. Every level holds, and the organization improves its processes against its own data.
- Rated Initial. Results depend on who runs each project, and nothing above this gap counts until every project is planned and controlled. (managed: Not yet)
- Rated Managed. Projects are under control, each in its own way. Anything in place above the Defined gap is set aside until that gap closes. (managed: In place, defined: Not yet)
- Rated Defined. Every project tailors one standard process, so results compare across projects. Anything above waits until performance is run by the numbers. (managed: In place, defined: In place, quant: Not yet)
- Rated Quantitatively Managed. Performance is predictable within limits the data sets. The last step is narrowing those limits on purpose. (managed: In place, defined: In place, quant: In place, optim: Not yet)
- Rated Optimizing. Every level holds, and the organization improves its processes against its own data. (managed: In place, defined: In place, quant: In place, optim: In place)
An example
A software contractor that built case-management systems for state agencies wanted to bid on contracts that asked for a CMMI rating at the Defined level. Its engineering director had already bought a metrics platform and trained two analysts in statistical control charts. A pre-appraisal by an outside lead appraiser came back lower than anyone expected: rated Managed, the second of the five levels. Every project was planned and tracked, but each ran its own process, so there was no organizational standard to measure. The statistics were measuring noise.
The company paused the dashboard work. A small process group wrote one standard development process with rules for tailoring it, set up a training plan, and added peer reviews and quality audits to every project. Fourteen months later the appraisal came back at Defined. The larger change showed up in staffing: when two senior project managers left that year, their projects kept the same method, the same estimates, and the same schedule.
The core idea
CMMI describes capable processes as sets of practices for planning, estimating, managing requirements, assuring quality, managing risk, training people, and measuring performance. It says what a capable organization does and leaves the method to it. Its maturity levels group those practices into a staircase. At Initial, work gets done, but when and at what cost depends on who is doing it. At Managed, each project plans its work and tracks it against the plan. At Defined, the organization has one standard way of working that every project tailors. At Quantitatively Managed, it sets numerical targets for its processes and manages to them. At Optimizing, it improves those processes continually from its own data.
The insight is that capability is cumulative. Statistical control of a process that changes with every project manager measures nothing, and continuous improvement without stable processes has no baseline to improve. So an appraisal rates an organization at the highest level whose practices, and every level beneath them, are in place. A second form rates single practice areas by capability, for improving one area at a time.
The thinking behind it
Watts S. Humphrey Watts S. Humphrey came to the Software Engineering Institute at Carnegie Mellon in 1986, after a long career at IBM, at a time when the Defense Department and its contractors wanted a common way to judge software practice. His answer, set out in Characterizing the Software Process: A Maturity Framework (1988), treated an organization's process as something that matures in stages, each the foundation for the next, and gave assessors a way to say which stage it had reached. He led the development of the Capability Maturity Model for Software, published in 1991, from which CMMI was integrated in 2000.
Where it sits in the layers
CMMI belongs in Layer 7, the assessment and maturity models, because it measures where an organization stands and names what comes next. It takes its premise from the improvement philosophies of Layer 6, above all Total Quality Management: the quality of a product follows the quality of the process that made it. It supports the layers below without choosing for them. A team can meet its practices with a methodology from Layer 8 such as Scrum, and the Quantitatively Managed level draws on tools such as Statistical Process Control from Layer 9. The common mistake is asking CMMI to do a methodology's job. An organization that writes procedures to match the model's practices, and then runs projects by those procedures, has turned an assessment into a heavy method it never chose.
How organizations put it to work
Adoption needs a senior sponsor who owns the result and a small process group that does the work: mapping current practice against the model, writing the standard processes and their tailoring rules, running training, and collecting evidence. The first move is a gap analysis, usually with an outside lead appraiser, which tells the company where it stands and which practice areas block the next level.
The changes land in routines. Projects start from a standard process and record how they tailored it. Peer reviews and quality audits become scheduled events. Measurement moves from what each manager likes to a common set of numbers kept across projects. Estimates start from the organization's own history, which is what makes them believable to a buyer.
A first year usually brings process definitions, pilots on two or three projects, and a formal appraisal at the end of that year or early in the next. Leaders should expect pushback about paperwork and should watch that the process group serves the projects. The lasting gain is a delivery record that does not depend on a few experienced managers, and estimates a customer can plan around.
Where it goes wrong
The most common failure is appraisal theater. Documents and evidence appear in the months before an appraisal and fade after it. Spot it by asking project teams how they tailored the standard process. If they cannot say, the process lives in a binder.
The second is level chasing. When a rating becomes the goal, the organization buys the visible practices of a higher level, such as dashboards and statistics, before the foundations hold, which is the failure the staircase is designed to expose. Spot it when measurement grows and predictability does not.
The third is weight. Critics, especially from the agile community, have argued that maturity models favor documentation and slow delivery, and that a rating describes the organization the appraisers sampled, which may not be the team on a given contract. Spot it when cycle times lengthen as the process library grows.
Related and rival frameworks
- Capability Maturity Model for Software. The software-only model CMMI replaced. Useful for its history, since most of what people still call the CMM levels began there.
- People Capability Maturity Model. Applies the same staged logic to managing people, from staffing to workforce planning. Use it when the gap lies in how people are hired, developed, and rewarded.
- ISO 9001 Quality Management System. A pass or fail certification of a quality management system. Choose it when customers ask for a certificate, and CMMI when they ask how predictable delivery is.
- Six Sigma. Attacks variation one process at a time with statistics. Useful at the upper levels, but premature where processes are not yet defined.
Go to the source
- Characterizing the Software Process: A Maturity Framework, IEEE Software 5(2), 1988
- Capability Maturity Model for Software, Version 1.1, Software Engineering Institute (Mark C. Paulk, Bill Curtis, Mary B. Chrissis, and Charles V. Weber), 1993
- CMMI: A Short History, Software Engineering Institute, 2009