Made a standard by J.P. Morgan's risk management group, which published its RiskMetrics method in October 1994 with a free data set; no source found credits one inventor of the measure, and an MSCI history stresses that VaR and RiskMetrics are not the same thing.
Puts one dollar figure on market risk, the loss a portfolio should exceed only on a small, chosen share of days over a set period, so a board can compare and limit very different risks with one yardstick.
A $100 million currency position, and the loss that one day in twenty can exceed
The position has a daily standard deviation of 0.565 percent, and returns are assumed normal, the simplest version of the method. Choose the confidence level and the horizon, and set the board's limit. The bars show the value at risk at three confidence levels for the chosen horizon, and the line shows the limit. Illustrative.
Value at risk, $ millionLimit
An example
A manufacturer held 100 million dollars of euro-denominated receivables, and the board asked a plain question: how much can we lose on this? The treasurer had no single number to give. The newly appointed risk manager estimated the daily swings of the exchange rate, multiplied the position by 1.65 standard deviations of those swings, and reported a one-day value at risk of $932,000 at 95 percent confidence.
The board treated the number as a ceiling, and the risk manager corrected it. A 95 percent level means the loss will be larger than $932,000 on about one day in twenty, which is roughly twelve trading days a year, and the figure says nothing of how much larger. The board set a limit of $1 million on the one-day number for all currency positions, and added a monthly stress test for the days beyond the threshold. The currency risk was priced on one scale, and the company's hedging decisions became easier to compare.
The core idea
Value at risk answers one question: how much can be lost, with a given probability, over a given time horizon. J.P. Morgan's technical document frames it as the most a portfolio's value is expected to fall, at a chosen probability, over a set horizon. Three choices set the number: the confidence level, the horizon, and the way volatility is estimated. In its simplest form, with returns assumed to be normally distributed, VaR at 95 percent is 1.65 standard deviations of the position's returns times the size of the position.
The document's own example is a position of $100 million in a currency with a daily standard deviation of 0.565 percent. That gives a VaR of 0.932 percent of the position, or $932,000, which means a loss of more than that is not expected on 95 percent of days. The insight is comparability. Different instruments, desks, and currencies can be put on one scale, which is the point the document makes when it says risks are comparable only when measured with the same yardstick.
The thinking behind it
J.P. Morgan's risk management group, which published the RiskMetrics method in 1994 No inventor of value at risk is named in the sources found. What they credit is a publication. In October 1994, J.P. Morgan's risk management group released its internal method as a technical document and a free set of volatility and correlation data, and the fourth edition of December 1996 was issued jointly with Reuters. The bank gave three reasons: to promote transparency of market risks, to set a benchmark for measuring them, and to help clients understand its advice. The technical document notes that market risk measures had become synonymous with the term. An MSCI history adds a caution that VaR is not RiskMetrics: RiskMetrics is one model that can produce the number.
Where it sits in the layers
Value at Risk sits in Layer 9, Tools and Techniques: a measurement instrument that risk programs borrow. It takes for granted, from Layer 1, that losses follow a distribution that can be estimated from past prices. The black swan is the standing objection, and antifragility asks what happens to a business when the tail arrives. Above it, Layer 8 programs such as the three lines of defense use the number as a limit that an independent function checks, since a trading or treasury desk may not set its own. Below it, the measure is put into practice in the daily risk report. The common mistake is asking it to describe the worst case. It marks where the bad days begin and is silent on how bad they get.
How organizations put it to work
The chief risk officer owns the measure, with a risk function that reports apart from the people who take positions. Adoption starts with a method: the confidence level, the horizon, and the volatility estimate are fixed in policy. Limits follow, stated in dollars per desk or program. The number is produced daily and checked against actual profit and loss, and the count of days on which losses exceeded it is reported as a test of the model.
It changes decisions about position size, hedging, and how risk is allocated among desks. A treasury with currency, interest, and commodity exposures can see them on one scale, and the board can set a single ceiling for the aggregate. It also changes who decides: a breach goes to the risk function, never to the person who took the position.
Sustaining it takes stable data and a validated method. In the first year a leader should expect arguments over the confidence level, a few positions that look larger on this scale than anyone assumed, and a rule that a breach is explained within a day. The business depends less on one trader's view of how safe a position is.
Where it goes wrong
The first failure is reading it as a ceiling. At 95 percent confidence, losses past the number occur on about one day in twenty. The sign is a board surprised by a loss larger than the figure it had been shown, and a report that never mentions what lies beyond.
The second is leaning on the assumptions. The simplest version assumes normally distributed returns, and the technical document itself says financial returns have fat tails and offers methods for non-normal distributions. A model fitted to a calm stretch understates stress. The sign is exceptions that cluster during a market shock instead of appearing at random.
The third is gaming and false comfort. A desk can sit just under a limit, or choose a window that shows lower volatility. A single number also invites the belief that risk is handled. The sign is positions that cluster just below the limit, and no stress tests alongside.
Related and rival frameworks
- Expected Shortfall. Averages the losses on the days beyond the threshold, which VaR leaves unmeasured. The better pick when the shape of the tail is the worry.
- Stress Testing. Applies a named shock, such as a currency collapse, and reads the loss directly. It covers events that recent history does not contain.
- Monte Carlo Simulation. Simulates many possible outcomes, from which a threshold loss can be read without assuming a normal curve. The better pick when returns are far from normal.
Go to the source
- RiskMetrics Technical Document, Fourth Edition, J.P. Morgan and Reuters, New York, December 17, 1996, 1996
- Return to RiskMetrics: The Evolution of a Standard, RiskMetrics Group, April 2001, by Jorge Mina and Jerry Yi Xiao, with an introduction by Christopher C. Finger, 2001