Developed in Japanese manufacturing, notably the automobile industry, and set out in English from the late 1980s; Robin Cooper and Regine Slagmulder's Target Costing and Value Engineering (1997) gives a full account.
Starts from the price the market will pay, subtracts the profit the company needs, and treats what is left as the most the product may cost, then makes the design team meet that figure before the product is released.
The most a new oven can cost, set by the price customers will pay
The market sets the price and the board sets the margin, so the most the oven may cost is the price less the margin. The bars split that allowable cost by function, and the line marks the design's current estimate for each. Set the price and the margin and see which functions must cut. Illustrative.
Target for the functionDesign estimate today
An example
A maker of commercial ovens priced its new model by adding up what the design would cost and applying a margin, which put the oven at $28,000. Its two largest customers said they would buy at $25,000 and not a dollar above. Under the old method that meant a margin squeeze and a quarterly argument. The new product lead used a different method. The market price was fixed at $25,000, the board required a 20 percent margin, and so the oven could cost $20,000 to make. The design cost $20,800.
The gap of $800 was split by function: housing, heating, controls, and packaging. Each team got a target and a deadline. The housing team found that a welded frame could become a bent one. Controls cut two circuit boards to one after talking with their supplier, who earned a fair return on the lower price. The oven launched at $20,000 to make, at the $25,000 price, with the margin intact.
The core idea
Target costing reverses the usual sequence. Conventional costing builds a cost and adds a margin to find the price. Target costing starts from the selling price that customers will accept and subtracts the required profit to get the allowable cost. Cooper and Slagmulder describe the target cost as the maximum cost at which a product must be made to earn its profit margin at its expected selling price, then broken down to the component level, where suppliers are asked to meet set prices while still earning adequate returns.
The insight is where cost is decided. It is fixed mostly in design, long before a factory sees the product, and Tanaka describes Toyota's practice as an effort to reduce cost at the design stage. So the method gives design teams the cost as a hard requirement, equal to function and quality. In the Japanese firms they studied, the authors found a cardinal rule: "The target cost must never be exceeded." Value engineering, a team-based search for ways to achieve the same function for less, is the usual means.
The thinking behind it
Japanese manufacturing and management accounting practice, notably in automobile makers such as Toyota and Nissan No single originator is credited, and no source found dates its start. English-language accounts appear from the late 1980s: Sakurai described it in Cost Management in 1989, Monden and Hamada wrote about it in Japanese automobile companies in 1991, and Tanaka reported on Toyota in 1993. Robin Cooper and Regine Slagmulder then set out the method in Target Costing and Value Engineering (1997) and, in the MIT Sloan Management Review in 1999, described seven Japanese firms using it: Isuzu, Komatsu, Nissan, Olympus, Toyota, Sony, and Topcon. The problem it answered was competition in markets where customers set the price and a firm could win only by designing the cost out in advance.
Where it sits in the layers
Target Costing sits in Layer 9, Tools and Techniques, though it bundles several techniques under one rule. It takes for granted, from the layers above, that value is set on the customer's side, as the demand-side view of the firm argues, and that cost can be reduced steadily through design and learning, as lean thinking holds. Below it, the targets run through supplier contracts and design reviews, and after launch the cost-cutting passes to kaizen, an improvement philosophy from Layer 6. The common mistake is asking it to find the price. The method assumes the market has already said what customers will pay. When that price is unknown, a different tool has to find it first.
How organizations put it to work
A program lead, often a chief engineer, owns the target, with finance helping to keep the figures honest. The method works through cross-functional teams that bring design, engineering, purchasing, and manufacturing to the same table, as in the Japanese firms studied, where at Toyota more than a hundred engineers from different divisions work on a typical project.
It changes decisions most. Design gate reviews test the cost against the target in the same room as function and quality. Allowable cost is split by function or component, and suppliers receive component targets while earning a fair return. The production reserve, typically 5 to 10 percent of the product-level target in the study, covers surprises and is released only with approval. Routines include a monthly cost review and a rule that a product which cannot meet its target does not launch.
In the first year a leader should expect the first program to miss, design reviews to be uncomfortable, and suppliers to resist the first set of targets. The return is cost that is known and shared across teams, and a business less dependent on the finance team's after-the-fact variance reports.
Where it goes wrong
The first failure is the permanent gap. Firms often set the product-level target above the allowable cost and plan to close the difference over time. If the closing never happens, the margin the price was supposed to protect never arrives. The sign is a gap that shrinks slowly across several models.
The second is cutting function to hit the number. Teams that must reach a cost can remove features customers value, or push suppliers until quality suffers. The sign is warranty claims, supplier failures, or complaints that follow a cost-down program.
The third is a guessed price. The whole method hangs from the selling price. If it is a hope that customers have not confirmed, the target moves with every review and the team stops believing it. The sign is a target revised more than once during design. The method also suits poorly the products with little design content, where commodity inputs set the cost and design can change little.
Related and rival frameworks
- Quality Function Deployment. Translates customer needs into design features. It tells the team which functions customers value, so that cost is cut where customers will not notice.
- Activity-Based Costing. Traces overhead to the activities a product consumes. It shows what a design actually costs, which target costing then compares with the allowable figure.
- Toyota Production System. The production philosophy at Toyota, one of the firms studied. Read it for the discipline of continual improvement that takes over after the product launches.
Go to the source
- Target Costing and Value Engineering, Productivity Press (Cooper and Slagmulder), 1997
- Develop Profitable New Products with Target Costing, MIT Sloan Management Review, Summer 1999 (Cooper and Slagmulder), 1999