Developed by Alistair Cockburn, whose Surviving Object-Oriented Projects (1998) presents Crystal Orange, and who set out the family in Agile Software Development (2002) and Crystal Clear (2005).
A family of software methods, named for colors, in which the right method grows heavier as a project's team gets bigger and the cost of failure gets higher, with a shared core of principles that favor people and frequent delivery.
Seven projects placed by team size and the cost of failure, to find the Crystal color
Crystal picks a color by team size (the columns) and criticality, the loss a failure could cause (the rows). Select a project, then the box it belongs in: the color and the rigor it needs appear. Show the sort to compare yours. Illustrative.
- Not placedPlacedClearYellowOrangeRed
- Not placedPlacedClearYellowOrangeRed
- Not placedPlacedClearYellowOrangeRed
- Not placedPlacedClearYellowOrangeRed
- Not placedPlacedClearYellowOrangeRed
- Not placedPlacedClearYellowOrangeRed
- Not placedPlacedClearYellowOrangeRed
What a failure costs
People on the project
Your sort matched 0 of 7.Your sort matched 1 of 7.Your sort matched 2 of 7.Your sort matched 3 of 7.Your sort matched 4 of 7.Your sort matched 5 of 7.Your sort matched 6 of 7.Your sort matched 7 of 7.
- Clear
- A very small team in one room. Delivers often and keeps paperwork light. Rigor rises as the box moves up the grid.
- Yellow
- A larger team that needs more coordination. Still light, with more structure as the stakes rise.
- Orange
- Several cross-functional teams. Heavier: defined integration, more testing, and a longer view.
- Red
- Many teams and the heaviest coordination. Rigor again rises as the stakes do.
The sort
- Internal scheduling tool: Clear. Small and low in stakes: the lightest Clear, with little paperwork.
- Online shop, 6 people: Clear. Still Clear, with a little more care for what discretionary money is at risk.
- Marketing site, 15 people: Yellow. Yellow: more coordination than six people need, with modest rigor.
- Billing, 18 people: Yellow. Yellow with the extra testing and review that essential money calls for.
- Claims platform, 40: Orange. Orange: several teams need a defined integration routine, with more testing.
- Infusion pump software: Yellow. A life-critical system needs the most rigor, even with a modest team.
- Airline scheduling, 70: Red. Red: the heaviest coordination, with strong rigor for the stakes.
An example
A software company ran every project the same way, with a heavy approval process built for its biggest contract. A four-person team building an internal scheduling tool spent a third of its time on documents that nobody read, while a forty-person team building a claims platform lacked the coordination it needed and kept finding integration defects late.
The engineering director sorted the projects by two questions: how many people, and what failure would cost. The small team's failure would cost some comfort, and the team sat in one room, so it dropped to a light method with delivery every few weeks and a review at the end of each. The claims system's failure would cost essential money. It stayed heavier, with several teams, a defined integration routine, and more testing. Lead times fell on the small projects, and the claims team's late defects dropped within two quarters.
The core idea
Crystal treats a method as something to fit to the project, and it sizes the fit on two measures. One is how many people must coordinate. The other is criticality, what a failure would cost: lost comfort, lost discretionary money, lost essential money, or lives. More people need more coordination and higher stakes need more rigor, so each combination calls for a different member of the family, named by colors that darken as the method grows heavier, from Clear through Yellow and Orange to Red.
What the members share matters as much as how they differ. All deliver in increments of four months at most, and preferably much shorter, all put talk among people ahead of documents, and none forbids practices borrowed from other methods. Crystal Clear, for up to six developers in one room, names seven properties of successful projects: frequent delivery, reflective improvement, osmotic communication (overhearing what matters), personal safety, focus, easy access to expert users, and a technical setting with automated tests and frequent integration.
The thinking behind it
Alistair Cockburn Alistair Cockburn built Crystal over several books. Surviving Object-Oriented Projects (Addison Wesley, 1998) presented Crystal Orange, a method for projects of roughly ten to forty people. Agile Software Development (2002) set out the whole family and its two measures, size and criticality. Crystal Clear (2005), subtitled A Human-Powered Methodology for Small Teams, described the lightest member in full, and one reviewer called it a methodology generator, a kit for building a method. The thread through all three is that people decide a project's fate, so a method should suit the project's people and risks and keep being tuned as the work goes on.
Where it sits in the layers
The Crystal family sits in Layer 8, Methodologies and Operating Systems, because each member is a bundled set of roles, work products, and rhythms for running a project. It takes for granted the values of the Agile Manifesto in Layer 6, with its preference for people and working software, and the trust described in Psychological Safety in Layer 5, which appears in Crystal as the property of personal safety. Below it, the reflective improvement it asks for is put into practice in a team's retrospectives in Layer 10. The common mistake is to treat the colors as maturity levels to climb. A heavier color is a response to a larger or riskier project, and a team that moves to Orange without the size or the stakes takes on overhead and gains nothing.
How organizations put it to work
A company adopts Crystal by assigning a project to a color. The owner is usually the head of engineering or a project management office, which sorts projects by size and criticality and sets the minimum practices for each color. The structural change is in the sorting. Different projects can legitimately run differently, and the office tells them apart by the cost of failure and the number of people.
The routines follow from the principles: delivery in increments of a few weeks to a few months, a short review of how the team is working at the end of each, and an expert user available to the team regularly. Measures turn toward delivered software and the health of communication in the team: how many working releases, how quickly information moves, whether people say when something is wrong.
Sustaining it takes honest sorting, since the temptation is to lighten a project that is critical, and managers who accept that two teams in the same company will not look alike. In the first year a leader should expect the clearest gains in small projects freed of ceremony. The business depends less on a single, heavy process, and critical work receives rigor in proportion to what failure would cost.
Where it goes wrong
The first failure is misjudging criticality. A team treats a system as a matter of comfort when its failure would cost essential money, and runs the light version. The sign is defects reaching customers in a system that matters.
The second is the color as a badge. Teams pick the lightest because it sounds modern, or the heaviest to look safe. The sign is a method that does not match the project's size or stakes.
The third is losing the people conditions. Crystal Clear assumes a shared office, frequent contact with expert users, and a climate where people say what is wrong. Where those are missing, the method has no mechanism to substitute. The sign is a distributed team with no shared place, following the Clear practices on paper.
A broader criticism is that it is a set of principles and tailored rules more than a procedure, so organizations that want a standard recipe may find it vague.
Related and rival frameworks
- The Agile Manifesto. The statement of values that Crystal shares, with no method attached. Read it for the reasons, and Crystal for a way to size a method to a project.
- Scrum. One lightweight frame with fixed roles and events, suited to a single team. The better pick when a team wants a clear routine, where Crystal asks it to tune one.
- Extreme Programming. A prescriptive set of engineering practices. Crystal allows a team to adopt its practices, so the two can be combined.
Go to the source
- Surviving Object-Oriented Projects: A Manager's Guide, Addison Wesley, Reading, Massachusetts, 1998
- Agile Software Development, Addison-Wesley, Boston, 2002
- Crystal Clear: A Human-Powered Methodology for Small Teams, Addison-Wesley, 2005