Plant Tour

Layers of Management ThoughtLayer 10: Practices and RitualsPracticeAlso known as Site visit, Factory tour, Plant visit, Study visit

A practice of industry with no single author: a well-recorded case of the study visit is Toyota's training at Ford's plants in 1950, which brought home the suggestion system Toyota started in 1951.

A planned visit to a working operation by people who do not work there every day, whether leaders, customers, or peers, to judge conditions for themselves and learn what reports and presentations cannot show.

Seven things seen on two supplier tours, sorted by how easily each is staged and what it says about the part

A buyer's tour of two molding plants. Select a sighting, then the box it belongs in: weigh most what is hard to stage and bears on the part, and send what is easy to stage to the audit. Show the sort to compare yours. Illustrative.

Items (select one, then a box)
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside
  • Not placedPlacedWeigh it mostVerify in the auditContextSet aside

What it says about the part

A lotLittle
Verify in the audit
Weigh it most
Set aside
Context
Easily stagedHard to stage

How easily it is staged

Hourly board with a miss. Second plant: a board by each press, filled in by hand every hour, with one missed hour and its cause.Not placed yet.Hourly board with a miss. Second plant: a board by each press, filled in by hand every hour, with one missed hour and its cause.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.Hard to fake for a day, and it shows how the plant reacts when something goes wrong.Hourly board with a miss. Second plant: a board by each press, filled in by hand every hour, with one missed hour and its cause.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.Hourly board with a miss. Second plant: a board by each press, filled in by hand every hour, with one missed hour and its cause.Context: Real, but it says little about the part. Note it and move on.Hourly board with a miss. Second plant: a board by each press, filled in by hand every hour, with one missed hour and its cause.Set aside: Prepared for the day and silent about the work. It should not move the decision.Rejects tagged by cause. Second plant: rejected parts in a hold area, each tagged with the defect found.Not placed yet.Rejects tagged by cause. Second plant: rejected parts in a hold area, each tagged with the defect found.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.A working quality system leaves this trail, and staging it would take weeks.Rejects tagged by cause. Second plant: rejected parts in a hold area, each tagged with the defect found.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.Rejects tagged by cause. Second plant: rejected parts in a hold area, each tagged with the defect found.Context: Real, but it says little about the part. Note it and move on.Rejects tagged by cause. Second plant: rejected parts in a hold area, each tagged with the defect found.Set aside: Prepared for the day and silent about the work. It should not move the decision.Operator's gauge check. Second plant: an operator shows how she checks a part against its gauge every half hour.Not placed yet.Operator's gauge check. Second plant: an operator shows how she checks a part against its gauge every half hour.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.She explains it in her own words, including what she does when a part fails.Operator's gauge check. Second plant: an operator shows how she checks a part against its gauge every half hour.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.Operator's gauge check. Second plant: an operator shows how she checks a part against its gauge every half hour.Context: Real, but it says little about the part. Note it and move on.Operator's gauge check. Second plant: an operator shows how she checks a part against its gauge every half hour.Set aside: Prepared for the day and silent about the work. It should not move the decision.Defect rate on a slide. First plant: the owner's slides promise 300 defective parts per million.Not placed yet.Defect rate on a slide. First plant: the owner's slides promise 300 defective parts per million.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.Defect rate on a slide. First plant: the owner's slides promise 300 defective parts per million.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.It is about the part, and anyone can type a number. Ask for the inspection records.Defect rate on a slide. First plant: the owner's slides promise 300 defective parts per million.Context: Real, but it says little about the part. Note it and move on.Defect rate on a slide. First plant: the owner's slides promise 300 defective parts per million.Set aside: Prepared for the day and silent about the work. It should not move the decision.Fresh paint, new video. First plant: walls painted for the visit and a video in the lobby.Not placed yet.Fresh paint, new video. First plant: walls painted for the visit and a video in the lobby.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.Fresh paint, new video. First plant: walls painted for the visit and a video in the lobby.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.Fresh paint, new video. First plant: walls painted for the visit and a video in the lobby.Context: Real, but it says little about the part. Note it and move on.Fresh paint, new video. First plant: walls painted for the visit and a video in the lobby.Set aside: Prepared for the day and silent about the work. It should not move the decision.Prepared for visitors, and silent about the part.Presses idle for the tour. First plant: the presses stand idle so nothing can go wrong.Not placed yet.Presses idle for the tour. First plant: the presses stand idle so nothing can go wrong.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.Presses idle for the tour. First plant: the presses stand idle so nothing can go wrong.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.Presses idle for the tour. First plant: the presses stand idle so nothing can go wrong.Context: Real, but it says little about the part. Note it and move on.Presses idle for the tour. First plant: the presses stand idle so nothing can go wrong.Set aside: Prepared for the day and silent about the work. It should not move the decision.Staged by stopping the work, so there is nothing to judge.Thirty-year-old presses. Second plant: most presses are thirty years old.Not placed yet.Thirty-year-old presses. Second plant: most presses are thirty years old.Weigh it most: Hard to fake for one day and about the work being bought. This is what the visit is for.Thirty-year-old presses. Second plant: most presses are thirty years old.Verify in the audit: About the work, but easy to prepare for a visitor. Ask for the records behind it.Thirty-year-old presses. Second plant: most presses are thirty years old.Context: Real, but it says little about the part. Note it and move on.Real and hard to hide, but age alone says little. The gauge checks and the reject trail say more about the parts.Thirty-year-old presses. Second plant: most presses are thirty years old.Set aside: Prepared for the day and silent about the work. It should not move the decision.

Your sort matched 0 of 7.Your sort matched 1 of 7.Your sort matched 2 of 7.Your sort matched 3 of 7.Your sort matched 4 of 7.Your sort matched 5 of 7.Your sort matched 6 of 7.Your sort matched 7 of 7.

Weigh it most
Hard to fake for one day and about the work being bought. This is what the visit is for.
Verify in the audit
About the work, but easy to prepare for a visitor. Ask for the records behind it.
Context
Real, but it says little about the part. Note it and move on.
Set aside
Prepared for the day and silent about the work. It should not move the decision.

The sort

  • Hourly board with a miss: Weigh it most. Hard to fake for a day, and it shows how the plant reacts when something goes wrong.
  • Rejects tagged by cause: Weigh it most. A working quality system leaves this trail, and staging it would take weeks.
  • Operator's gauge check: Weigh it most. She explains it in her own words, including what she does when a part fails.
  • Defect rate on a slide: Verify in the audit. It is about the part, and anyone can type a number. Ask for the inspection records.
  • Fresh paint, new video: Set aside. Prepared for visitors, and silent about the part.
  • Presses idle for the tour: Set aside. Staged by stopping the work, so there is nothing to judge.
  • Thirty-year-old presses: Context. Real and hard to hide, but age alone says little. The gauge checks and the reject trail say more about the parts.

An example

A maker of kitchen appliances needed a second supplier for a molded handle and sent its supplier quality engineer and a buyer to tour two molding plants in one week. The first plant ran the visit as an event. The walls had been painted, a video played in the lobby, the owner's slides promised 300 defective parts per million, and the presses stood idle so nothing could go wrong.

The second plant changed nothing for the visit. The visitors followed the resin from the receiving dock to the shipping bay while the presses ran. A board by each press was filled in by hand every hour, with one missed hour and its cause written beside it. Rejected parts sat in a hold area, tagged by defect, and an operator showed how she checked a part against its gauge every half hour. The presses were thirty years old. The engineer scored the second plant higher on everything that bore on the part, though its price was 3 percent higher, and the company gave it the larger share of the volume.

The core idea

A plant tour is a visit to an operation, planned around a purpose, by people who do not work there every day. Three purposes cover most tours. Leaders tour their own sites to see the conditions behind the reports. Customers and auditors tour a supplier to judge whether it can deliver what it promises. Peers tour another company's operation to learn a practice that no document fully carries, usually in exchange for a return visit.

The practice rests on two claims. An operation shows more than it reports: the state of the floor, the work waiting between steps, and the way people answer questions reveal whether a process is under control. And a visit counts as evidence only when the plant is seen as it runs. A tour that follows the product's path through a working plant, and talks with the people doing the work, sees the real operation. A tour staged for the day mostly measures the host's preparation, which is why a plant that can take visitors any day without warning makes the strongest case of all.

The thinking behind it

Industrial study and customer visits The study visit has a well-recorded case at Toyota. In 1950 the company sent a managing director to Ford, where he spent about six weeks observing the Rouge, Highland Park, and other plants and also visited 21 machine tool makers. A second managing director trained at the Rouge plant for about six weeks that autumn and came home with Ford's suggestion system, which Toyota started in May 1951 as its Creative Idea Suggestion System. The first judged Toyota's technology close to Ford's and its gap mostly one of scale, materials, and machine tools. The episode shows what the practice is for: knowledge that reports do not carry passes when people see the work itself.

Where it sits in the layers

The plant tour is a practice of Layer 10, where the layers above become visits on a calendar. It assumes what Lean Thinking holds in Layer 6, that conditions are learned by going to see them, and its learning form puts to work the socialization step of the SECI Knowledge Spiral in Layer 5, where know-how passes between people through shared experience. Management by Walking Around applies the same conviction beside it in Layer 10, at a manager's own site. Customer tours feed the assessments of Layer 7, such as a supplier's ISO 9001 audit, with what visitors saw. The common mistake is asking a tour to do an audit's job. A two-hour walk can show whether a plant looks under control, but it cannot verify records, capability, or what happens on the night shift, so a supplier decision needs the audit as well.

How organizations put it to work

A tour program is owned by the site's manager, with a short written standard: who may visit and how far ahead they book, the route (the product's path from receiving to shipping), what is off limits for safety or confidentiality, and who walks with each kind of visitor. The best programs change as little as possible for a visit. Boards are kept current every day, the hold area is real, and operators answer questions in their own words, so visitors see the plant as it runs and staff stop losing days to preparation.

Three routines follow from the three purposes. Leaders visit every site on a fixed rhythm and arrive with questions drawn from the numbers. Customer tours get a standard briefing and an owner for every request a visitor makes. Study visits to other companies are offered in exchange for a return visit, prepared with two or three questions tied to a known gap, and closed with a trial back home within weeks.

The measure that matters is what changed after each visit: actions closed, trials run, customers won or kept. In the first year, expect pressure to stage tours, then fewer and better visits.

Where it goes wrong

The first failure is the staged tour. Floors are cleared, a video plays, and the line is stopped so nothing can go wrong, and visitors learn only that the host prepared. Spot it when tours are booked for quiet hours, or when staff hear about a visit days ahead.

The second is industrial tourism among peers. A team visits an admired plant, takes photographs, and copies the visible tools without the routines behind them. Spot it when a visit's report lists what was seen and no trial follows.

The third is the tour that replaces the audit. A customer approves a supplier on a good walk and skips the records. Spot it when a supplier problem surfaces somewhere the tour never went, such as the night shift or a subcontracted process. Hosts carry a risk of their own: showing a peer more than they meant to.

Related and rival frameworks

  • Gemba Walk. A manager's routine walk through their own operation to see problems and back the people fixing them. The better pick for leaders at their own site.
  • Management by Walking Around. The broader philosophy of managers staying present and informal. A plant tour is a planned visit with a purpose, open to outsiders.
  • Leader Rounding. Scheduled leader visits built on set questions, from hospitals. Better when the aim is to hear from staff and follow up on what they need.

Go to the source

Back to the catalog