Built in the lean management systems of manufacturing plants and set out by David Mann in Creating a Lean Culture (2005), whose daily accountability process links three tiers of daily meetings, from team leaders with their crews to value stream leaders with supervisors and support groups.
Links short daily stand-up meetings in tiers, from the front line up to a site's leaders, so that a problem raised at the start of a shift reaches someone able to remove it within hours.
Six problems raised at one unit's morning huddle, sorted by the lowest tier that can fix them
Each tier meets later in the morning than the one below it. Select a problem, then the tier that should own it: a problem stays at the lowest tier with the authority to fix it, and only the rest climb. Show the sort to compare yours. Illustrative.
- Not placedPlacedUnit teamManagers and directorSite leaders
- Not placedPlacedUnit teamManagers and directorSite leaders
- Not placedPlacedUnit teamManagers and directorSite leaders
- Not placedPlacedUnit teamManagers and directorSite leaders
- Not placedPlacedUnit teamManagers and directorSite leaders
- Not placedPlacedUnit teamManagers and directorSite leaders
Raised at 8:30
Lowest tier that can fix it
Your sort matched 0 of 6.Your sort matched 1 of 6.Your sort matched 2 of 6.Your sort matched 3 of 6.Your sort matched 4 of 6.Your sort matched 5 of 6.Your sort matched 6 of 6.
- Unit team
- Tier 1: the unit's staff at their board. Fix what the unit controls, on the spot or by the end of the shift.
- Managers and director
- Tier 2: unit managers with their director. Move staff and priorities across the department's units.
- Site leaders
- Tier 3: directors, the chief nursing officer, and the support departments. Anything needing equipment, pharmacy, or money gets an owner before the meeting ends.
The sort
- Scanner broken, no spare: Site leaders. Only biomedical engineering can supply one. Raised at 8:30, owned at 10:00, a loaner on the unit at 11:40.
- Fall-risk sign missing: Unit team. The charge nurse posts it during the huddle. Sending it up would only slow it down.
- Call lights slow: Unit team. The team staggers its handoffs so someone always covers the hall. It is within the unit's control.
- Two nurses short tonight: Managers and director. The unit cannot hire overnight, but the director can move a nurse from a quieter unit and call the float pool.
- Patient needs a sitter: Managers and director. The director approves a sitter from the department's pool. Nothing outside nursing is needed.
- Pharmacy slow on a drug: Site leaders. Pharmacy is a support department, so only the top tier can give the delay an owner.
An example
A 300-bed hospital ran three tiers of morning huddles: each unit's team at its board at 8:30, unit managers with their director at 9:15, and directors with the chief nursing officer and the support departments at 10:00.
On a Tuesday, the surgical unit's 8:30 huddle raised six problems in ten minutes. The team fixed two on the spot: a missing fall-risk sign and slow call-light answers at shift change. Two nurses short for the night and a confused patient who needed a sitter went to the 9:15 huddle, where the director moved one nurse from a quieter unit, called the float pool, and approved a sitter. The unit's only bladder scanner had broken, and pharmacy was slow with one antibiotic. Nursing could solve neither, so both reached the 10:00 huddle, where biomedical engineering promised a loaner by noon and pharmacy named an owner for the delay. The scanner arrived at 11:40. A month later, having seen equipment fail on four units, the 10:00 huddle set up a shared pool of spares.
The core idea
Tiered huddles are a chain of short daily meetings, each held at a board, in which every level of an operation reviews yesterday's results and today's problems and passes up what it cannot fix. Tier 1 is a frontline team with its leader. Tier 2 brings those leaders together with their manager. Tier 3 brings managers together with the site's leaders and the support departments, such as maintenance, quality, or purchasing, that own most of what the lower tiers cannot fix. The meetings are staggered through the morning so that each feeds the next, and answers travel back down the same path.
The logic is speed with discipline. A problem is handled at the lowest tier that can solve it, so senior time goes only to what needs senior authority, and anything that needs it arrives the same morning, days before any weekly review. Because every tier meets daily, leaders see the operation's real problems while they are still small, and patterns across escalations point to the fixes worth making once for every unit.
The thinking behind it
David Mann David Mann spent fifteen years building lean management systems at Steelcase, across more than forty value stream conversions, and wrote Creating a Lean Culture (2005) on the premise that lean production needs a lean way of managing to last. The book names four principal elements of that system: leader standard work, visual controls, a daily accountability process, and leadership discipline. The accountability process is the tiered meeting: team leaders with their production crews, then supervisors with team leaders, then value stream leaders with supervisors and support groups, each meeting feeding the next. The book won a Shingo Prize in 2006 and reached a third edition in 2015.
Where it sits in the layers
Tiered huddles are a practice of Layer 10, where a lean management system becomes a daily clock. They put to work the Toyota Production System and Lean Thinking from Layer 6, whose idea of improvement depends on surfacing problems fast, and they are the working core of the Daily Management System beside them in Layer 10, which joins the huddles to leader standard work and visual boards. Problems that stay at a tier are worked with Layer 9 tools such as the A3. The common mistake is asking the huddles to set priorities or targets. Huddles move today's problems to someone who can fix them. Targets come from planning such as Hoshin Kanri in Layer 8, and huddles that start debating them run long and stop escalating.
How organizations put it to work
Tiered huddles are owned by the line. Each tier's leader runs its meeting, and the site leader owns the system and attends the top tier every day. Setting them up takes a fixed schedule that staggers the tiers so each feeds the next, a board at each tier showing yesterday's results, today's risks, and open issues with owners, and a rule for what moves up: anything the tier cannot fix itself, with a name and a time for the answer. Support departments attend the top tier, since most escalations end with them.
The routines change more than the structure. Problems raised at dawn have owners by mid-morning. Leaders hear the floor's real issues every day, and answers travel back down the same tiers, so whoever raised a problem hears what happened to it. Patterns across escalations show where one fix would serve every unit.
In the first year, expect meetings that run long, boards that go stale, and escalations that never come back down. Sustaining it takes leader standard work that puts the huddles on calendars and a habit of closing every escalation within the week. The return is fewer hours lost to problems everyone already knew about, and an operation that runs on routine, with less riding on a few experienced people's heroics.
Where it goes wrong
The first failure is the status meeting. Each tier recites numbers and nobody asks for help, so problems wait for the weekly review anyway. Spot it when the escalation column stays empty while staff keep complaining about the same issues.
The second is the black hole. Issues go up, nothing comes back down, and the front line stops raising them. Spot it by tracing last month's escalations: how many returned to the person who raised them, and how fast.
The third is meeting creep. Tiers start late, run long, and crowd out the work. Spot it when a ten-minute huddle takes thirty, or when managers spend the whole morning moving from one huddle to the next. In a small operation, three tiers can also be one structure too many, and a single daily huddle with the site leader may be enough.
Related and rival frameworks
- Daily Management System. The fuller lean routine of leader standard work, visual boards, and leader walks that the huddles belong to. Pick it when designing the whole system.
- Daily Standup. A software team's short daily check on progress toward its goal. One team and one tier, with no escalation path built in.
- Gemba Walk. Takes leaders to the work itself. It pairs with the huddles, showing leaders what no board can.
Go to the source
- Creating a Lean Culture: Tools to Sustain Lean Conversions, Productivity Press, 2005
- Creating a Lean Culture: Tools to Sustain Lean Conversions, Third Edition, Productivity Press, 2015