Agenda

Power & PoliticsEssay7 min read

Ask an executive for their agenda and you get a statement: a few aims, in order of importance, with the reasons each one matters. Lena Ortiz, the actor in the series' running example, might say hers is to run all of her freight company's overnight operations. Moving the night dispatch desks onto her budget is one step toward it.

In The Lam System for Political Interaction, the agenda is where every address starts, and it is the one constituent that never closes. It is also never declared: no act performs it, and nothing in the record states it. Whatever Lena says her agenda is, what the record holds under it is the list of pursuits she actually opened, numbered in the order they began. The agenda is therefore where an actor's stated aims and their actual political work can be laid side by side, and only the actor can do the comparing.

The constituents of a maneuver

Structure. Each line joins a constituent to one it contains.

The map shows what contains what in one actor's maneuver, from the actor down to what flows back when the cycle closes. It illustrates the structure only.

  • Actorα / a · A name only, performed by no oneThe person who opens the cycle and acts within it.
    • AgendaThis essayΑ / A · A name only, performed by no oneThe actor's long-running aim, which holds every cycle the actor opens.
      • Interestι / i · Performed by the actorWhat the actor stands to gain from the cycle.
        • Detectionδ / d · Performed by the actorThe actor finding out who controls the resource wanted.
        • Targetτ / t · A name only, performed by no oneThe person whose decision completes the cycle.
          • Decision MatrixΔ / D · A name only, performed by no oneThe options open to the target, each weighed by what it offers and what it asks.
            • Preferred Positionπ / P · A name only, performed by no oneThe option that leads to the outcome the actor wants.
              • Benefitβ / b · A name only, performed by no oneThe favorable conditions an option offers the target.
              • Costκ / c · A name only, performed by no oneWhat an option requires the target to spend or give up.
              • Utilityλ / u · A name only, performed by no oneAn option's benefit net of its cost.
            • Adverse Alternativeψ / X · A name only, performed by no oneAn option that leads away from the outcome the actor wants.
              • Benefitβ / b · ↺ Benefit, under Preferred PositionThe favorable conditions an option offers the target.
              • Costκ / c · ↺ Cost, under Preferred PositionWhat an option requires the target to spend or give up.
              • Utilityλ / u · ↺ Utility, under Preferred PositionAn option's benefit net of its cost.
            • PerceptionΓ / G · Performed by the targetHow the target compares the options' worth before choosing.
          • SelectionΣ / S · Performed by the targetThe target's choice among the options.
        • Objectiveω / o · Performed by the actorThe direction the actor wants the target's choice to take.
          • Intentionγ / g · Performed by the actorA specific action the actor chooses to move the target's options. A cycle holds one or more.
            • Required Resourcesθ / q · Performed by the actorWhat the actor must hold to carry out the intention.
            • Executionε / e · Performed by the actorThe actor carrying out the chosen action.
            • A sub-cycle's interest, when the gate fails↺ Interest, under AgendaWhen the actor lacks a resource the intention needs, a sub-cycle opens whose interest is exactly that resource. It is an ordinary interest, drawn here a second time.
        • OutcomeΩ / O · Performed by the cycle itselfThe state the cycle closes in, one of the futures that were possible.
          • Obtained ResourcesΦ / Q · Performed by the actorWhat the actor gains when the cycle closes.
          • Obtained UtilityΛ / U · Performed by the targetWhat the target gains from the outcome.
    • Current ResourcesΘ / R · A name only, performed by no oneWhat the actor holds now, counted.

A root with nothing to declare

The agenda is the actor's long-running aim, held across cycles. In the map it sits directly under the actor, beside what the actor holds, and every interest the actor pursues sits under it. Each interest is a cycle: one thing wanted, from one target's decision.

Like the actor and the target, the agenda is a name only. Interest has its moment, when the actor says what is wanted, and so does detection; the opening of a cycle has an entry of its own, written by the cycle. The agenda has none. When Lena's maneuver with the chief operating officer, Daniel Okafor, begins, the record's first entry says that a new cycle opens under her agenda, and that is the agenda's whole appearance: the place the new cycle is filed. The aim itself, running the overnight operations, stays with Lena.

The absence costs the record nothing. A statement of the agenda would be the one entry that nothing else in the record could check, a declaration of intent with no act to test it and no selection to answer it. The pursuits filed under the agenda can be checked. Each has an interest, a target, levers, spending and a close, and each either delivered what it was opened for or did not.

The record's version of an agenda

The agenda, as the record shows it, is what the actor did. Lena's stated aim is overnight operations. Her record's agenda is the dispatch desks and whatever she opens after them. If nothing about the yards or the overnight staffing is ever opened as a cycle, the record shows an agenda of one pursuit, whatever Lena tells people.

The gap between the two tells the actor something. An aim that never gets a cycle is one the actor is not pursuing politically, whether they are waiting for the right moment or have let it go. A run of cycles that serve no stated aim shows where their political effort is going instead. The system does not check whether a pursuit serves the agenda, because that is a judgment about the actor's own purposes and it is theirs to make. It files every pursuit in one place, in order, so that the comparison can be made.

Numbered as they open

Each new top-level pursuit is its own cycle under the agenda, with its own number, given when it opens and never reused. A pursuit that failed or was given up keeps its number, so the agenda's count includes every attempt, whether it delivered or not. Because the record never rewrites an entry, the numbering has to be right from the start. A lone pursuit is written as the agenda's only interest, and the system reads that as the first, so when a second pursuit opens it takes the next number and nothing already written changes. That is why the series writes Lena's maneuver at "the only interest": so far there is one pursuit on her agenda. If she opens a second, the dispatch move is already the first.

[A/i1/o./g2/i./t.][A/i2/t.]

Read aloud, the first: the target of the interest opened under the second lever, under the objective of the agenda's first interest. That is Priya Natarajan, the controller, whose sign-off Lena's second lever needed. The second: the target of the agenda's second interest, whoever Lena aims her next pursuit at.

Both are targets of cycles Lena opened, and their addresses show how differently the cycles sit. Priya's cycle hangs from a lever. It exists because a gate failed, it wants exactly what that gate lacked, and when it closes it hands back to the gate. The second pursuit hangs from the agenda. It wants something for its own sake, and when it closes, what it obtained flows into what Lena holds.

The number is the first step of every address below the agenda, and it is what keeps two pursuits apart. The second lever of the first pursuit and the second lever of the second read identically after that first step, and the number alone keeps the record from confusing a lever Lena played this year with one she plays next.

The agenda is written with the Greek capital alpha, Α, and the Latin capital A, which look the same in most type, and the system reads the two as one symbol. The capital marks a whole: the container of every interest the actor pursues.

One pursuit after another

A new pursuit opens under the agenda only once the previous maneuver has ended and nothing is left waiting on a sub-cycle. While Lena's cycle with Daniel is open, the only new cycle that can open is a sub-cycle under one of its levers, and only when that lever's gate fails. Between maneuvers, the agenda takes its next pursuit. The rule means that when a sub-cycle closes, only one thing can happen next: the cycle waiting above it resumes. The essay Opening a Cycle takes up the rule itself.

The rule sorts Lena's wants for her. Priya's sign-off could not have been filed as a pursuit of its own while Daniel's cycle was running, which is right, since its only value was to the second lever. Something Lena wanted for its own sake, such as the depot managers' cooperation once the desks were hers, could not be slipped into Daniel's cycle as a sub-cycle either, because a sub-cycle can want only what its lever's gate asked for.

Where does a new cycle open?

Illustrative. A want the actor has not yet pursued, checked in order from the top. Tick each check that holds; the first one left unticked says where the want goes instead.

Where this want goesAnother record: a want that belongs to someone else's agenda is that person's pursuit, written in their record

Executives pursue several aims at once, and within one record the system keeps an agenda's pursuits in sequence. Two pursuits running truly side by side, each with levers in play at the same moment, are among the things the system does not yet represent, and the essay What the System Cannot Yet Represent names it.

How it goes wrong

Political work done off the agenda leaves the record wrong without showing it. Lena asks Daniel for a small favor in a corridor, spends some of her standing with him and never opens a cycle for it. Her standing is now lower than her record says. The next time a gate tests whether she has enough standing with Daniel, the count it reads is wrong, and nothing in the record shows why. Every exchange that spends something belongs under the agenda, or the holdings drift away from the record of them.

Folding a fresh attempt into an old one does a different kind of damage. Had Daniel refused, and had Lena come back later with new levers, the second attempt would be a new pursuit with a new number, and the first would stay as it ended. An actor who thinks of the two as one long campaign, and writes them as one, loses the fact that the first attempt failed, and with it whatever the failure showed about Daniel.

What the actor learns

Read in order, the agenda shows whether each pursuit left the actor able to attempt the next. A single cycle cannot show that, because it records one exchange; the agenda records the sequence, and the actor's holdings between pursuits show whether the exchanges are compounding. The budget and the desks, obtained in the first pursuit, are resources Lena can spend in the second. If she spends them well, the second returns more than it cost and leaves her better placed for a third. An actor whose pursuits cost more than they return is running down their capital however many decisions they win along the way, and the holdings between pursuits are the one place that shows it.