An event of Scrum, which Ken Schwaber and Jeff Sutherland first presented in 1995, and which their Scrum Guide defines as a working session with stakeholders on the sprint's outcome, stressing value from 2017 and progress toward a Product Goal from 2020.
Puts each sprint's working product in front of the people it is for, so that what they see, and what has changed around them, reshapes the backlog before the next sprint begins.
Seven reactions from one sprint review of an outage app, sorted by what each does to the backlog
The review's job is to turn what stakeholders see into changes to the backlog. Select a reaction, then the box for what it does: add an item near the top, move one up, move one down or drop it, or note it low. Show the sort to compare yours. Illustrative.
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
- Not placedPlacedAdd near the topMove it upMove down or dropNote it, add low
Effect on priority
Already on the backlog?
Your sort matched 0 of 7.Your sort matched 1 of 7.Your sort matched 2 of 7.Your sort matched 3 of 7.Your sort matched 4 of 7.Your sort matched 5 of 7.Your sort matched 6 of 7.Your sort matched 7 of 7.
- Add near the top
- New and important. Write it as an item and place it near the top for the next planning.
- Move it up
- Already listed, and now worth more. Raise it in the order.
- Move down or drop
- Already listed, and now worth less. Lower it or remove it.
- Note it, add low
- New but unproven. Record it at the bottom and let refinement weigh it.
The sort
- Restore time as a promise: Add near the top. New and urgent, since customers will plan around a time no one can guarantee. Add an item to show a range and the time of the last update.
- Agents need account lookup: Move it up. Account lookup was already planned. The agents' need makes it worth more now, so it moves up.
- Outage cause rule by March: Add near the top. New, with a date attached. Add it near the top so it lands in time.
- Planned outages go by text: Move down or drop. The planned page for scheduled outages would duplicate the texts, so it is dropped.
- Map colors hard to read: Move it up. Accessibility fixes were already listed. Seeing real users struggle moves them up.
- Could it have a dark theme?: Note it, add low. A pleasant idea with no evidence of need. Add it low and let refinement weigh it.
- Billing link can wait: Move down or drop. Already listed and now worth less, so it drops down the order.
An example
A team building an outage app for a regional power utility ended its sprint with a review in the operations center. Instead of slides, it put the new outage map on the big screen and let a call-center lead and two line supervisors use it while the product owner took notes.
The map worked, and the reactions reshaped the backlog. The call-center lead warned that customers would read the estimated restoration time as a promise, so the team added an item to show a range and the time of the last update. Account lookup, already planned, moved up because agents needed it to answer calls. A planned page for scheduled outages was dropped once the supervisors pointed out that customers already got those notices by text. The operations manager mentioned a new rule requiring each outage's cause to be shown by March, and that went near the top. When the app went live a month later, calls asking when the power would be back fell by a fifth.
The core idea
The sprint review closes a sprint's work by putting what was built in front of the people it is for. The Scrum Team shows the increment, the finished and usable work of the sprint, to key stakeholders. The group discusses progress toward the product goal and what has changed outside the team, such as customers, rules, or budgets, and together they decide what to do next. That decision lands in the product backlog, where items are added, reordered, or removed before the next sprint planning.
The guide calls the review a working session and warns against shrinking it to a presentation, and the distinction carries the whole idea. A demonstration that ends in applause yields no decisions. A session where stakeholders use the product and argue about what it means gives the product owner evidence for the next order of work. Because it recurs every sprint, at most one sprint's work can rest on a wrong assumption before someone outside the team catches it. In Scrum's terms, the review inspects and adapts the product, as the retrospective does the process.
The thinking behind it
Ken Schwaber Ken Schwaber and Jeff Sutherland built Scrum on empiricism, the idea that teams learn by doing and should decide on what they observe, and gave the sprint four events in which the team inspects and adapts. The review applies that view to the product itself: the team and its stakeholders inspect what the sprint produced and what has changed around it, then decide what to change. Their 2017 revision of the guide pressed the point that value is the review's subject, with attendees working out what to do next to raise it.
Jeff Sutherland Jeff Sutherland, co-author of each version, kept the review in the 2020 guide and tied it to the newly added Product Goal, the longer objective each sprint moves toward. The 2020 text places the review second to last in the sprint, ahead of the retrospective, limits it to four hours for a month-long sprint and less for shorter ones, and tells teams plainly that a review is work done together with stakeholders, more than a show put on for them.
Where it sits in the layers
The sprint review is a practice of Layer 10, the event where Scrum in Layer 8 checks its product against the people it serves. It assumes what the Agile Manifesto holds in Layer 6, which prefers working software to documentation and customer collaboration to contract negotiation, and it feeds Backlog Refinement and Sprint Planning beside it in Layer 10 with a reordered backlog. Stakeholders' reactions are often weighed with Layer 9 tools such as the Kano Model. The common mistake is asking the review to approve or grade the team's work. Run as a sign-off gate or a performance check, it turns into a show staged for the sponsor, and the feedback it exists to gather dries up. Acceptance is settled during the sprint by the definition of done, and the review's job is to decide what comes next.
How organizations put it to work
The review is owned by the product owner, who invites the stakeholders and decides how the backlog changes, with the developers showing the work and answering questions. Organizations that get value from it run it as a working session. Stakeholders who use or pay for the product attend every time, the increment is shown working, in a test environment if it is not yet released, and the second half of the time goes to what to do next, including what has changed in the market, in operations, or in the budget.
It changes how the business steers a product. Feedback arrives every sprint, long before launch, the backlog is reordered in the open with stakeholders present, and sponsors judge progress by working software. A simple measure is how often a review changes the backlog. When the answer is rarely, the review has slipped into a demonstration.
In the first year, expect thin attendance, demos rehearsed like sales pitches, and stakeholders who save their real opinions for later. The return is less money spent building what nobody wants, and a product whose direction rests on evidence from its users more than on one sponsor's preferences.
Where it goes wrong
The first failure is the demo. The team presents slides or a scripted walkthrough, stakeholders nod, and nothing changes. Spot it when no backlog item moves after a review.
The second is the empty room. Stakeholders stop coming because the review feels like a status meeting, so the team inspects its work with itself. Spot it when attendance shrinks to the Scrum Team and one manager, or when the same proxy always speaks for the customers.
The third is the acceptance gate. Stakeholders use the review to sign off or reject work item by item, and the team starts hiding what is unfinished. Spot it when unfinished work is shown as finished, or when the review ends in a defect list with no talk of direction. Reviews also struggle when the increment cannot be seen, as with back-end work, and showing its effect on one real case helps.
Related and rival frameworks
- Sprint Retrospective. Follows the review and inspects how the team worked, where the review inspects what it built. Every sprint needs both.
- Customer Advisory Board. Gathers selected customers to advise on direction over months. The better pick for strategic questions, where the review handles the latest increment.
- Sprint Planning. Starts the next sprint from the backlog the review has just reordered. When the review changes nothing, planning repeats the last sprint's choices.
Go to the source
- The Scrum Guide, Ken Schwaber and Jeff Sutherland, 2020
- Scrum Guide Revisions, Ken Schwaber and Jeff Sutherland, the changes between each version since 2010, 2020